Search Forum
Blog Entry# 5778664
Posted: Jul 18 2023 (16:21)
No Responses Yet
No Responses Yet
Instead of ADI , NWR should run it between Ju and Delhi after electrification work gets finished.
The route should be via RGS , stops should be at GGN , RGS , Merta
This will surely do wonders afterwards.
route length is roughly 550 kms .. a VB train set can cover the same in 6.5-7 hours.
it...
more...
The route should be via RGS , stops should be at GGN , RGS , Merta
This will surely do wonders afterwards.
route length is roughly 550 kms .. a VB train set can cover the same in 6.5-7 hours.
it...
more...