Search Forum
Blog Entry# 5798313
Posted: Aug 14 2023 (20:06)
No Responses Yet
No Responses Yet
Aug 14 2023 (20:06) 12231/Lucknow - Chandigarh SF Express | PYGS/Prayagraj Sangam (5 PFs)
PrakharYadav^~
PrakharYadav^~ 12721 blog postsTraffic Block of Sadar Washing line/Lucknow from 18.08.2023 to 16.12.2023 (120 Days) for Up-gradation of 26 Coach Length New Washing Line as per latest CAMTECH drawing.
At Present, Primary Maintenance. of t.no. 12232/12231/14218/14217 (No. of rakes-4, Load-24 coaches ICF at Present) is done at Sadar Washing line Lucknow
During traffic block Rakes of 12231/14218/14217/12232 Will get Primary Maintenance at...
more...
At Present, Primary Maintenance. of t.no. 12232/12231/14218/14217 (No. of rakes-4, Load-24 coaches ICF at Present) is done at Sadar Washing line Lucknow
During traffic block Rakes of 12231/14218/14217/12232 Will get Primary Maintenance at...
more...