Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

WAP-7 - दिल तुझपे कुर्बान

Search Forum
<<prev entry    next entry>>
Blog Entry# 5800441
Posted: Aug 17 2023 (19:41)

1 Responses
Last Response: Aug 17 2023 (21:41)
1 Followers
General Travel
8513 views
3

Aug 17 2023 (19:41)   DKAE/Dankuni Junction (5 PFs)
Ars007~
Ars007~   182 blog posts
Entry# 5800441            Tags  
2 compliments
Useful Useful
Yesterday on 17.08.2023 from Press Information Bureau, New Delhi, I am sharing with you what I understood after listening to Railway Minister Ashwini Vaishnab's speech of about 1.15 hours:-

➡️ Originally the speech was about the last leg of Eastern Dedicated Freight Corridor Shonnagar - Dankunni 538 km PPP model. Asked about this by two or three journalists, he replied that this part is not happening now, instead Sonnagar - Andal Multitracking Project (374 km), which is fully underwritten by the Ministry of Railways, will serve as a feeder route for EDFC
...
more...
in West Bengal and Jharkhand. In mining, industrial areas. So instead of the proposed 1875 km Ludhiana - Dankuni EDFC, the 1337 km Ludhiana - Shonnagar EDFC ends.Then EDFC will then integrate/mix the IR track as this multitracking project.

➡️ He said that since the Quadruple track from Sitarampur to Shaktigarh via Khana is already available, moreover, if Shaktigarh - Chandanpur is built, the entire Dankuni stretch will be Quadruple, so there is no need to make a separate DFC here, 2 of the 4 tow lines will be used as DFC.

➡️ As the missing link or extra 3rd & 4th line was not there from Shonnagar to Andal, this multi tracking project is for that.

So now the hope of a freight corridor up to Dankuni is lost in West Bengal. Very sad to hear this, I was hoping for such a big project in this part of our state, but it will not materialize🥲🙂

Translate to English
Translate to Hindi

3893 views
1

Aug 17 2023 (21:41)
Sanz~
Sanz~   8516 blog posts
Re# 5800441-1              
There were many bottlenecks but still should have continued
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy