Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Mandovi Express - the best 5-Star Restaurant in the world

Search Forum
<<prev entry    next entry>>
Blog Entry# 5808427
Posted: Aug 28 2023 (16:13)

6 Responses
Last Response: Aug 31 2023 (21:50)
General Travel
420653 views
6

Aug 28 2023 (16:13)   13351/Dhanbad - Alappuzha Express (PT) | BZA/Vijayawada Junction (10 PFs)
SaiRBRTRailway~
SaiRBRTRailway~   3431 blog posts
Entry# 5808427            Tags   Past Edits
1 compliments
Useful
Cancellation and Diversion Of Trains In Vijayawada Divison
Translate to English
Translate to Hindi

1 Posts

112465 views
0

Aug 28 2023 (22:42)
SaiRBRTRailway~
SaiRBRTRailway~   3431 blog posts
Re# 5808427-2              
Vellaki timing ee telidu ee month antha marriage season and next dasara vundi Aina works avatle why haven't they fasten up things in past 2 months when there is lean season they should have cancelled more trains and should have finished all works in June itself
Translate to English
Translate to Hindi

106829 views
0

Aug 31 2023 (10:20)
deepak.yerr~
deepak.yerr~   6105 blog posts
Re# 5808427-3              
They have extended cancellations of Uday and Simhadri upto Monday. There are diversions of Alleppy exp, Hatia Erkm/ Benguluru slots trains till September end.
Translate to English
Translate to Hindi

108055 views
1

Aug 31 2023 (15:16)
SaiRBRTRailway~
SaiRBRTRailway~   3431 blog posts
Re# 5808427-4              
1 compliments
Agree
Now I feel they won't gonna speed up 130 KMPH trains with all these works and Heavy Freight speedup of trains are not possible
I had expected trains trains will do vskp bza in 5.5 hours and bza Gdr in 4hours with 130 KMPH but I don't see that coming into reality
Translate to English
Translate to Hindi

104923 views
0

Aug 31 2023 (18:39)
deepak.yerr~
deepak.yerr~   6105 blog posts
Re# 5808427-5              
I personally experienced it the train cruisng at 130kmph covered 96km in 1hr 7min from DVD to Annavaram with a brief halt zero speed halt at Elamanchili outer but took 6hrs to reach Vja from Vskp with 3 regular stops of which 20mins is wasted in Mustabad Vja PF.
Translate to English
Translate to Hindi

106753 views
0

Aug 31 2023 (21:50)
SaiRBRTRailway~
SaiRBRTRailway~   3431 blog posts
Re# 5808427-6              
Same happened with me plenty of times once while traveling in CBE JP Exp Almost Did MAS GDR in 2hours but slowed near gdr and 20min delay is added this happens near bza ndd as well experienced with Circar Vikramasimhapuri ICE done BZA GDR in 3h53min or so once I with 7 stops so i thought 4 hour bza Gdr is possible for stop heavy trains and 3h30 min for limited stop trains for me 10 min Speed up is possible for every 100KM once the route is upgraded to 130 KMPH bza Gdr is 293 KM so 30 min Speedup is possible and 35 min is possible between BZA vskp,bza sc routes
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy