Search Forum
Blog Entry# 5814398
Posted: Sep 04 2023 (22:09)
13 Responses
Last Response: Sep 05 2023 (18:24)
13 Responses
Last Response: Sep 05 2023 (18:24)
Sep 04 2023 (22:09) 08551/Visakhapatnam - Kirandul Special | VZM/Vizianagaram Junction (5 PFs)
SCoRUArlys~
SCoRUArlys~ 3348 blog postsUttarandhra new updates
1. Vizianagaram - Khurda Rd 3rd line gave green signal by Centre soon works will start.
2.Raising of sectional speed from the existing level of 110 Kmph to 130 Kmph between Palasa (Ex.) and Visakhapatnam.
Maximum Permissible Speed of the section is raised from 110 Kmph to 130 Kmph between Palasa-Visakhapatnam on UP line, DN/MID line & 3rd line (excluding UP...
more...
1. Vizianagaram - Khurda Rd 3rd line gave green signal by Centre soon works will start.
2.Raising of sectional speed from the existing level of 110 Kmph to 130 Kmph between Palasa (Ex.) and Visakhapatnam.
Maximum Permissible Speed of the section is raised from 110 Kmph to 130 Kmph between Palasa-Visakhapatnam on UP line, DN/MID line & 3rd line (excluding UP...
more...
4 Public Posts - Mon Sep 04, 2023
7 Public Posts - Tue Sep 05, 2023
Reduce 13 min between ee tdd add 8 min between ndd rjy reduce 10 min between rjy slo
Tuni akp can be done in 40 minutes add 30 min slack at che and spread ur coaches have them both at front and back
Flagged
Tuni akp can be done in 40 minutes add 30 min slack at che and spread ur coaches have them both at front and back
Flagged
1 Public Posts - Tue Sep 05, 2023