Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

कोशी की जीवन रेखा — मानसी सहरसा रेलखंड - Prabhat Sharan

Search Forum
<<prev entry    next entry>>
Blog Entry# 5848107
Posted: Oct 09 2023 (20:28)

6 Responses
Last Response: Oct 09 2023 (22:59)
General Travel
19782 views
23

★★★
Oct 09 2023 (20:28)  
HarshaI22159^~
HarshaI22159^~   10488 blog posts
Entry# 5848107              
8 compliments
Great Useful Great Useful Great Great Great Useful
Vande Sadharan to have 12 SL, 8 GS, 2 EOG/SLR

Source: click here
Translate to English
Translate to Hindi

2 Posts

13260 views
0

Oct 09 2023 (20:36)
Exynos9611~
Exynos9611~   15878 blog posts
Re# 5848107-3              
okk
Translate to English
Translate to Hindi

10808 views
0

Oct 09 2023 (20:58)guest
Re# 5848107-5              
Aisa kahi notification ya press release nhi hai railway ke traf se ki sleeper and general varient of VB will be named as VANDE SHADARAN so don't named it by your choice.... Railway may named is as some other name there is no 100% suriety of this
Translate to English
Translate to Hindi

9464 views
1

Oct 09 2023 (22:45)
saikarthik148~
saikarthik148~   3261 blog posts
Re# 5848107-6              
1 compliments
Agree
Livery change,Ac na hogi,GS accha hoga along with P-7 range loco on 130mps + SL me fare increase hoga compared to a red LHB SL 130 mps SF is JAN SADARAN
Translate to English
Translate to Hindi

10121 views
4

Oct 09 2023 (22:59)
LHB_for_18047~
LHB_for_18047~   10828 blog posts
Re# 5848107-7              
3 compliments
Agree Useful Agree
Instead of this nonsense they should have just focused the same money on increasing the producing of normal LHB GS and SL coaches.
Train sets should have been exclusively for premium category trains only to run them at 160 MPS in future and normal LHB trains at 130 MPS.
First only normal LHB production is slowed down coz of which many trains still left in ICF and this will slow even more.
Complete
...
more...
wastage of resources and time. Jack of all master of none.
Every RM comes introduces something new starts work on it then leaves and when a new RM comes he introduces another new concept and the previous one is left in dust and this carries on.
Instead of trimming down the categories of trains we have we are simply adding new and new just for some political gains.
Why can't we simply have only two types of premium trains ie. CC VB and SL VB by converting all JNS and Shatabdis to VB rakes and categorising them with existing VB as CC VB and then same thing to Rajdhanis, Durontos, AC SF, Garib Raths as SL VB.
In non premium trains we can have SF, M/E, Antyodaya, passenger trains with normal LHB rakes.
Priority wise as follows:
1. VB both CC and SL.
2. SF
3. M/E
4. Antyodaya
5. Passenger.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy