Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Everyone is a gangster (Rajdhani, Shatabdi, Tejas) until the real Gangsta (Vande Bharat) walks in 😂 - Mushfique Khalid

Search Forum
<<prev entry    next entry>>
Blog Entry# 5893062
Posted: Nov 25 2023 (11:34)

11 Responses
Last Response: Nov 26 2023 (11:24)
General Travel
54138 views
7

Nov 25 2023 (11:34)   12713/Satavahana SF Express | BZA/Vijayawada Junction (10 PFs)
NaagendraV
NaagendraV   290 blog posts
Entry# 5893062            Tags   Past Edits
1 compliments
Useful
List of new railway line/ routes at various states in SCR 2023-24.
-----------------------------------------------------------------------------------------------------------------------
SCR - Andhra Pradesh*************************

Preliminary Engineering cum Traffic Survey for byepass line connecting Vijayawada-Machilipatnam
section
...
more...
to (Vijayawada--Gudur section for Visakhapatnam traffic bound for Chennai and viceversa and thus avoiding Vijayawada Jn. (49 km)

Reconnaissance Engineering cum Traffic Survey for new line between Darsi and Narsaraopet (65 km)
Reconnaissance Engineering cum Traffic Survey for new line between Narsapur-Machhlipatnam ( 85km )
Reconnaissance Engineering cum Traffic Survey for Dharmavaram-Bellari new line (120 km)
Reconnaissance Engineering cum Traffic Survey for Mantralayam Road-Kurnool new line (110 km)

Final Location Survey for new line between Vijayawada- Guntur via Amaravati (106 km)
Final Location Survey for Doubling of Dharmavaram – Pakala – Katpadi (290 Km)
Final Location Survey for Doubling of Guntur – Bibinagar (248 Km)
RET survey for Muddanuru-Mudigubba new line (65Km)
Final Location Survey for doubling of Gooty-Pendakallu line (29 Km)
Final Location Survey for doubling of Pakala-Tirupatiline (42 Km)
Final Location Survey for proposed tripling bet. OBVP GTL
Final Location Survey for tripling between Renigunta-Gudur
Final location survey for tripling between Samalkot and Nidadavolu (72 Km)
Final Location Survey for 3rd line between BZA-NDD
Final Location Survey for Doubling Nallapadu-Krishna Canal (3rd and 4th Line) (33.62 kms.)
Final Location Survey for 3rd line between Vijayawada and Duvvada (335 km)

-----------------------------------------------------------------------------------------------------------------------------

SCR -Telangana: ************************************
1.Preliminary Engineering cum Traffic Survey for new line betwen Bodhan-Bidar (100 km)
2.Preliminary Engineering cum Traffic survey for third line between Secunderabad-Kazipet (134 km)
3.Preliminary Engineering cum Traffic Survey for doubling of Parbhani to Parli (67 km)
4.Preliminary Engineering cum Traffic Survey for byepass line at Purna (3 km)
5.Preliminary Engineering cum Traffic Survey for doubling of Secunderabad- Mudkhed- Adilabad (420km)
6.Preliminary Engineering cum Traffic Survey for Balharshah-Kazipet 4th line (234 km)
7.Preliminary Engineering cum Traffic Survey for Kazipet- Vizayawada 4th line (219 km) --

8.Reconnaissance Engineering cum Traffic Survey for Siddipet - Akkanapet (50 km)
9.Reconnaissance Engineering cum Traffic Survey for new line between Mancherail - Adilabad via Utrfoor (186 km)
10.Reconnaissance Engineering cum Traffic Survey for new line of Dornakal - Miryalguda (133 km)
11.Reconnaissance Engineering cum Traffic Survey for new line between Ghanpur and Surya via Palakutri, Kodakandla (170 km)
12.Reconnaissance Engineering cum Traffic Survey for new line between Kothagudem and Kirandul (180 km)
13.Reconnaissance Engineering cum Traffic Survey for new line between Bodhan - Biloli- Mudkhed-Jalkot- Latur Road (130 km)
14.Reconnaissance Engineering cum Traffic Survey for new line between Yavatmal-Adilabad via Ghantiji, Pandharkavadan, Chankha (100 km)
15.Reconnaissance Engineering cum Traffic Survey for new line between Patancheru - Sangareddy - Jogipet - Medak (95 km)
16.Reconnaissance Engineering cum Traffic Survey for new line between Nizamabad-Nirmal-Adilabad (125 km)
17.Reconnaissance Engineering cum Traffic Survey for new line between Manakondur - Huzurabad and Elkaturchi (60 km)
18.Reconnaissance Engineering cum Traffic Survey for new line between Karkheli-Narsi (30 km)
19.Reconnaissance Engineering cum Traffic Survey for new line between Bijapur and Warangal (288 km)
20Reconnaissance Engineering cum Traffic Survey for new line between Yavatmal-Adilabad via Ghantji- Pandharkavda-Chanakha (100 km)

21.Final Location Survey for new line between Bidar and Nanded (155 km)
22.Final Location Survey for doubling of Moulali-Sanathnagar line (21 Km)
23.Final Location Survey for doublin of Motamari- Vishnupuram line (89 Km)
24.Final Location Survey for Doubling of Dornakal-Manuguru line (104 Km)
25.Final Location Survey for Doubling betwwen Aurangabad and Ankai (98 Km) with bypass at Ankai
26.Final Location Survey for Doubling Secunderabad (SC)-Sanathnagar (S.NoF) 3rd line (19.18 kms.)
27.Final Location Survey for Doubling Secunderabad - Kazipet (85.48 kms.
28.Final Location Survey for Doubling Shankarpalli- Chittaguda (3rd and 4th Line) (19.22 kms.)
29.Final Location Survey for Doubling Sulehalli-Malkhaidroad (3rd and 4th Line) (17.18 kms.)
30.Final Location Survey for Doubling Tandur-Nawandgi(3rd and 4th Line) (18.95 kms.)
31.Final Location Survey for Doubling Vikarabad-Dharur (3rd and 4th Line) (22.27 kms.)
32.Final Location Survey for new line between Manuguru -Ramagundam
33.Final Location Survey for Bodhan-Bidar via Banswada New Line (138 Km)
34.Final Location Survey for Bye-pass line at Purna Jn to connect Purna-Akola line to Manmad-SC line (3.05 km)
35.Final Location Survey between Gangakher -Vadaganilla (DL)
36.Final Location Survey between Parbhani - Pokarni narasimha (DL)
37.Final Location Survey between Pokarni narasimha -Gangakher(DL)
38.Final Location Survey between Vadaganilla - Parli(DL)
39.Final Location Survey for 3rd line between SC-KZJ
40.Final Location Survey for 3rd line between SC-Wadi
41.Final Location Survey for 3rd line between SLODuvvada
42.Final Location Survey for Doubling Bhongir (BG)-Bibinagar (BN) 3rd Line (15 kms.)
43.Final Location Survey for Doubling Bhongir-Aler (3rdand 4th Line) (24.4 kms.)
44.Final Location Survey for Doubling Chitgidda (CTF) -Vikarabad (VKB) 3rd Line (9.93 kms.)
45.Final Location Survey for Doubling Dharur (DRR) -Tandur (TDU) 3rd Line (20.64 kms.)
46.Final Location Survey for Doubling Ghanpur-Raghunathpalli (3rd and 4th Line) (17.2 kms.)
47.Final Location Survey for Doubling Ghatkesar- Bibinagar (3rd and 4th Line) (14.25 kms.)
48.Final Location Survey for Doubling Kazipet-Ghanpur(3rd and 4th Line) (21.25 kms.)
49.Final Location Survey for Doubling Lingampalli-Shankarpalli (3rd and 4th Line) (22.29 kms.)
50.Final Location Survey for Doubling Nawandgi (NAW)- Malkhaid Road (MQR) 3rd Line (29.5 kms.)
51.Final Location Survey for Doubling Nizamabad Station(8 kms.)
52.Final Location Survey for Doubling Raghunathpalli(RGP)-Aler (ALER) 3rd Line (28 kms.)
53.Final Location Survey for Doubling Sanathnagar(S.NoF) -Lingampalli (LPI) 3rd Line (14.12 kms.)
54.Final Location Survey for Doubling of Akola – Dhone
via Purna, Mudhkhed, Secunderabad, Mehboobnagar
excluding Purna – Mudkhed and Bolarum –
Mehboobnagar including Dhone bye-pass (626 Km)

#Scr #SCRrailway #scrinfra
Please find the source as an attachment.

Translate to English
Translate to Hindi

5 Public Posts - Sat Nov 25, 2023

9027 views
0

Nov 25 2023 (21:48)
Ramkumar^~
Ramkumar^~   18295 blog posts
Re# 5893062-6              
GNT - BIBINAGAR Doubling already start avutunte inka FLS enti bro
Translate to English
Translate to Hindi

5 Public Posts - Sun Nov 26, 2023
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy