Electrification Update:
So From Simaluguri to Dibrugarh via Sibsagar Town OHE Pole Positioning is Complete now Other Equipments are to be Installed then OHE Wires, Wire Holders etc will be Installed Soon we will See Electric wires + Diesel Locos chugging till Electric Locomotives Start Running.
Credit: Vicky Kunwar
Date: 30 November 2023
So From Simaluguri to Dibrugarh via Sibsagar Town OHE Pole Positioning is Complete now Other Equipments are to be Installed then OHE Wires, Wire Holders etc will be Installed Soon we will See Electric wires + Diesel Locos chugging till Electric Locomotives Start Running.
Credit: Vicky Kunwar
Date: 30 November 2023
2 Posts
Last Time I Saw that only OHE Poles From Moranhat to Lepetkata and No OHE Poles Foundation between Lepetkata and Dibrugarh and Simaluguri to Moranhat where OHE Poles Foundations are Complete and By Side of the Areas There OHE Poles Lying on the Ground
Date 29 October 2023
Date 29 October 2023