Vande Sadharan/Amrit Bharath Production got slowed down at ICF, Chennai. It has been 21 days since last sleeper coach of the train got dispatched to ECR. (ICF took only 3 days gap between the production of WR and ECR coaches).
May be they're waiting for material procurement or something.
On the other hand, SCR almost got its entire LHB quota since ICF bombarded SCR with AC Economy coaches and lately with Sleeper and Deen Dayalu Coaches.
This...
more...
May be they're waiting for material procurement or something.
On the other hand, SCR almost got its entire LHB quota since ICF bombarded SCR with AC Economy coaches and lately with Sleeper and Deen Dayalu Coaches.
This...
more...
No,i think railways have planned both sets before and both were built at same time since we saw 2 sets of Amrit Bharat locos from CLW and more will be produced after these trains start their service