Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

হাওড়া - বর্দ্ধমান কর্ড লাইনে যান, 130 কিমি বেগে ট্রেন যাওয়াও কালবৈশাখী ঝড়ের থেকে ভয়ঙ্কর! - Jishnu Thakur

Search Forum
<<prev entry    next entry>>
Blog Entry# 5898981
Posted: Dec 02 2023 (10:02)

No Responses Yet
Info Update
12199 views
4

Dec 02 2023 (10:02)   CSMT/Mumbai CSM Terminus (18 PFs)
Exynos9611~
Exynos9611~   15593 blog posts
Entry# 5898981            Tags   Past Edits
2 compliments
Useful Great
#Admin #Moderator Source Cr X Handle

#CRInfraUpdates
❇️CSMT station-
Extension of platform Nos 10,11,12 & 13,14 at CSMT for dealing 24 coach length trains.
💰Cost
...
more...
– 62.12 Cr.
❇️Physical Progress – 70%

❇️Scope of Works:
▪️Extension of Platform No. 10/11 by 382m along with yard remodelling including construction of service buildings. (Existing Length – 298 mtr and proposed length 680 mtr).
▪️Extension of Platform no 12,13,14 by 305 mtr (Existing PF length – 385 mtr, Proposed platform length – 690 mtr).
▪️Removal of 61 old OHE masts & portals and its relocation.
▪️Removal of 71 old signalling and telecommunication obstructions in the form of Signal posts Junction Box and its relocation.
▪️Dismantling of 9 old obstructions in the form of dry pit lines and washing pit lines & stabling sidings.
▪️Dismantling of 25 Turnouts+3 track Diamond arrangement and Insertion of 14 track turnouts
▪️Dismantling and linking of plain track 2 Km length.

❇️Completed works:
▪️Dismantling of Carnac Bunder ROB (Road Over Bridge) completed.
▪️Construction of RRI (Route Relay Interlocking) building (G+3) having 34mtr x8.5mtr size completed.
▪️Substation building (25x5.5m) Completed.
▪️Object Controller Rooms at CSMT and Masjid Completed.
▪️Laying and linking of track to a length of 2 km of platforms connecting to existing lines has been completed.

🟥Completion od this work will improve mobility of trains in CSMT-Dadar area.
CSMT station-
Extension of platform Nos 10,11,12 & 13,14 at CSMT for dealing 24 coach length trains.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy