TATA Steel Express - Second Sitting sasta bhi, sabse achha bhi - Ravi Raj

Search Forum
<<prev entry    next entry>>
Blog Entry# 5901938
Posted: Dec 05 2023 (17:01)

No Responses Yet
Info Update
5198 views
2

Dec 05 2023 (17:01)  
Exynos9611~
Exynos9611~   16576 blog posts
Entry# 5901938              
1 compliments
Useful
SWR to conduct Final Location Survey for Rail Network Expansion

In a significant move to enhance railway infrastructure, the South Western Railway (SWR) is set to conduct a Final Location Survey (FLS) for various projects, including the doubling and quadrupling of railway lines.

The
...
more...
Chief Administrative Officer, Construction, on behalf of The President of India, has invited E-Tenders for these crucial survey projects within the SWR/CN region.

Project Details
Advertised Value: ₹380,956,390.50
Completion Period: 24 Months

Tentative FLS Works
Doubling between Bengaluru (SBC) – Tumakuru (TK): 3rd & 4th line (70 km)
Doubling between Bangarpete (BWT) – Jolarpettai (JTJ): 3rd & 4th line with ghat section (72 km)
Doubling between Chamarajanagar (CMNR) – Mysuru (MYS): (60 km)
New Circular Rail Network around Bengaluru City: Nidavanda (NDV) – Doddaballapur (DBU) – Devanahalli (DHL) – Malur (MLO) – Heelalige (HLE) – Hejjala (HJL) – Solur (SOLR) – Nidavanda (NDV) (287.60 km)
Hospet-Vyasa-colony: Doubling of Existing line (58 km)
Doubling between Hubballi (UBL) – Hospet (HPT): 3rd & 4th line (143 km)
Doubling between Hassan (HAS) – Kunigal (KIGL) – Chickbanavara (BAW): (166 km)
Doubling between Bengaluru (SBC) – Mysuru (MYS): 3rd & 4th line (137 km)
Ginigera-Raichur: Doubling of Existing line (166 km)
Vyasa-colony-Kuttur-Amaravathi colony: Doubling of Existing line (196 km)
Malagur-Madakshira-Hiriyur: New line doubling (110 km)
Gadag-Wadi: Doubling of Existing line (257 km)
Also read | Final Location Survey called for Hubballi Ankola Double Line

*Stages of FLS Work*
Stage – 1: Initial study of Satellite Imagery, DEM, DSM, feature extraction, and development of topographic maps. Establishing control points and verifying obligatory points, followed by evaluation of horizontal and vertical alignment.

Stage – 2: Finalization of alignment using photogrammetric techniques, Drones, and LiDAR survey. Includes geotechnical and hydrological studies, approval from Railways, and preparation of topographical maps.

Stage – 3: Preparation of general arrangement/drawings for structures, Yard engineering scale plans, layout plans, and detailed estimates. Works commence after finalization/approval of L-section in stage 2.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy