Search Forum
Blog Entry# 5903224
Posted: Dec 06 2023 (22:35)
No Responses Yet
No Responses Yet
Today on dated 06.12.23 the statutory inspection of Jhansi- Datia 3rd line was carried out PCEE NCR along with officials from Jhansi Division and RVNL.
After thorough inspection, the OHE was charged and speed trial was successfully conducted.
click here
After thorough inspection, the OHE was charged and speed trial was successfully conducted.
click here