Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

TATA Steel Express - Second Sitting sasta bhi, sabse achha bhi - Ravi Raj

Search Forum
<<prev entry    next entry>>
Blog Entry# 5908525
Posted: Dec 12 2023 (08:30)

18 Responses
Last Response: Feb 08 (13:32)
Rail Fanning
79188 views
15

★★
Dec 12 2023 (08:30)   12116/Siddheshwar SF Express | TNA/Thane (10 PFs) | KYN/WDP-4D/40361
Vivek.Venugopalan^~
Vivek.Venugopalan^~   2131 blog posts
Entry# 5908525            Tags   Past Edits
6 compliments
Great Great Great Great Agree Great
SOLAPUR - CSMT Siddheshwar SF Express arrives at Thane with Kalyan WDP-4D 40361.

This train has been running with diesel traction for a while and it is utter waste of resources in running a train with diesel traction on a fully electrified route. You are not only burning diesel for pulling the train but EOG is also consuming a hell lot of it.
...
more...

The electrification of lines hasn't happened in a fortnight and they had enough time to pre-plan and demand the locos and get them allocated. Besides, it has been more than a year since the Konkan section and the Mumbai - Solapur - Chennai section have been electrified and still they are struggling with electric locomotives.

The inefficiency at Central Railways is at its peak currently where they have been incompetent in getting e-locos allocated while other zones get it easily.

Very sad state of affairs being a railfan from CR Zone.

Vivek

Translate to English
Translate to Hindi

13 Public Posts - Tue Dec 12, 2023

1 Public Posts - Mon Dec 18, 2023

1 Public Posts - Tue Jan 02, 2024

21303 views
1

Jan 02 (11:23)
DrAbhijay2407
DrAbhijay2407   611 blog posts
Re# 5908525-16              
1 compliments
Agree
Valid point . Railways need to smartly plan loco allocation.
In some zones , mail/ express/passenger trains with a lot of stoppages are given WAP-7/WAP-5 ; whereas CR , SWR are running superfast trains with WAG-9/WAG-7 ............
What is the use of electrification when trains are not able to get electric locomotives befitting their average speed and schedule ?

...
more...
Even In UBL-SBC section , 12725/26 and 20653/54 recently got e-locos after the freshly allocated WAP-7 reached KJM shed . Despite electrification completed months back.
While UBL Shed is full of WAG-9s , it lacks passenger electric locos .

IR needs to upscale WAP-7 and WAP-5 production over WAG-9 , and allocate to these zones with dire need. And if not so , it is better to see a wdp4 humming and notching up than a " green Goblin " struggling to keep up with the train's schedule.

Translate to English
Translate to Hindi

2 Public Posts - Thu Feb 08, 2024
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy