Search Forum
Blog Entry# 5931221
Posted: Jan 03 (19:52)
41 Responses
Last Response: Jan 06 (02:16)
41 Responses
Last Response: Jan 06 (02:16)
Change in timings of trains.May be due to introduction of asr and Svdk vb
36 Posts
People like to see a brand new train in a brand new avatar. They forget that it's the same train that will slow down their existing mode of transportation. I have maintained that VBs should be a replacement for Shatabdis in most cases, and should only be added on routes where there is heavy demand, which are few and far between.
Seriously:? These many trains slowed down (or rather mowed down) to make look VB best. Shatabdi's slowdown is biggest shock.
So many train timings to be adjusted for just a single train. I guess most of these trains will be slowed down so on one hand IR can hype of high speed rail connectivity given to people on the other side which they will never show is the number of trains slowed down due it.
Ideally CC VB trains should have been given to Shatabdis and when SL rakes come out to Rajdhanis and Durontos.