Search Forum
Blog Entry# 5961615
Posted: Feb 04 (23:08)
7 Responses
Last Response: Feb 05 (11:45)
7 Responses
Last Response: Feb 05 (11:45)
Feb 04 (23:08) 20641/Bengaluru Cantt. - Coimbatore Jn. Vande Bharat Express | GUV/Guruvayur (3 PFs)
S_V_Iyer^~
S_V_Iyer^~ 18233 blog postsFor your opinion please..
CBE BNC VB is not yielding desired patronage levels which may be due to :-
1. Inconvenient Timings
2. Slow TT
3....
more...
CBE BNC VB is not yielding desired patronage levels which may be due to :-
1. Inconvenient Timings
2. Slow TT
3....
more...
2 Posts
Extending to GUV is fine, but who is going to maintain the train in that case ?? GUV cannot maintain VB
IMO, better the route can be swapped between Uday and VB. Uday can maintain its present running time easily via DPJ HSRA, and it will fetch better patronage also enroute, as it already has. VB at the other end, can be made to run via ED SA TPT BWT KJM, making it faster than it is actually, and if it takes 5 - 5.5 hrs max, it will be a good deal for sure, and the patronage also improves a lot for vande bharat, being a faster option.
Well.. sooner or later GUV will have to maintain VB sets....
For now, this VB can run for 5 days a week between GUV and BNC and weekly between CBE BNC till PM facility is created at GUV.
For now, this VB can run for 5 days a week between GUV and BNC and weekly between CBE BNC till PM facility is created at GUV.
Very much possible but care should be taken to ensure convenient travel time to passengers.
Yes that too should be ensured. A slot later than the slot of CBE MAS ICE could be chosen, after that, till the departure of mayiladuthurai JS, slot is available I believe.