Nagercoil Shalimar express Left Renigunta 1025 VJA 1640 RJY 720 Vskp 2225 ICF rake 60 mins late
Tirupati Bhubaneswar Renigunta 1055 VJA 1655 overtook NGL at Tadepalliguem RJY 1900 VSKP 2200 arrived 25 mins early. LHB rake
Uday VJA 1715 RJY 1940 Vskp 2300
Don't...
more... know what VJA controllers have in mind on unnecessary overtake and yesterday freight are not let in corridors in between trains may be they are few in VJA Vskp section in evening tome zone so all trains ran to full speed in both directions. Experienced the same last week Janmabhomi covered VJA Vskp in 5hr 50mins with 110kmph max speed. (I travelled in train,), ot was a continous run with no stops in between for signaling and stops are 2-3 mins more then given 2mins. Last week except on Saturday 2330 Uday reached before 2310 on 4 runs.
Freight control punctuality of Express trains.
please wait...Translate to EnglishNagercoil Shalimar express left Renigunta at 10:25 AM VJA 4:40 PM RJY 7:20 PM Vskp 10:25 PM. It's running 60 minutes late.
Tirupati Bhubaneswar Renigunta left at 10:55 AM, reached VJA 4:55 PM, overtook NGL at Tadepalliguem, reached RJY 7:00 PM, and VSKP 10:00 PM. It arrived 25 minutes early. It's a LHB rake.
Uday left VJA at 5:15 PM, RJY at 7:40 PM, and Vskp at 11:00 PM.
Don't know what the VJA controllers have in mind with unnecessary overtakes. Yesterday, freight trains were not allowed in between the corridors of the trains. Maybe there are a few trains in the VJA Vskp section in the evening, so all the trains are running at full speed in both directions. I experienced the same thing last week when Janmabhomi covered VJA Vskp in 5 hours and 50 minutes with a maximum speed of 110kmph. It was a continuous run with no stops in between, except for signaling and the actual stops were 2-3 minutes longer than the given 2 minutes. Last week, Uday reached before 11:10 PM on 4 runs, except on Saturday at 11:30 PM.
Freight controls the punctuality of express trains.