The following Final Location Surveys are started or going to start in SER:
1. Tamluk-Panskura 3rd line & 4th line
2. Kharagpur-Santragachi 4th line
3. Shalimar-Santragachi 3rd line
4. Kharagpur-Adityapur 4th line
5....
more...
1. Tamluk-Panskura 3rd line & 4th line
2. Kharagpur-Santragachi 4th line
3. Shalimar-Santragachi 3rd line
4. Kharagpur-Adityapur 4th line
5....
more...
12 Posts
also demand for survey of dfc corridor from kharagpur to nagpur if this dfc is built then hwh ngp mumbai trains punctuality will go 100% and will be never late from hwh to ngp
18029/30 LHBfication will be soon, collection of LHB coaches for rake formation is underway in SER. Lhbfication notice soon expected.
Kgp-ngp dfc Currently no plan as far i know. 3rd line work going on, 4th line survey started from HWH to KGP to JSG SER jurisdiction.
18047/48 should also be LHBfied it's ICF coaches are too old and frankly 19 coach ICF rake not enough for such a train.
Full 22 coach LHB rake should be given to it with a PC. Those idiots in SCR and SWR should cancel the slip.
Full 22 coach LHB rake should be given to it with a PC. Those idiots in SCR and SWR should cancel the slip.
Bokaro-Peterbar-Rajrappa-Ramgarh should be connected via rail line. There has been no new rail
like development in the entire district for years.