Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

The train is a small world moving through a larger world - Niraj Kumar

Search Forum
<<prev entry    next entry>>
Blog Entry# 5983465
Posted: Mar 01 (12:06)

No Responses Yet
Timeline
154 views
0


TAGEERUANUBHARADWA...
Mar 01 (12:06)
Mar 01 (12:06)   Okha - Tuticorin Vivek Express (PT)/19568   Train - Rake/Coach Composition
Agent Techie
TAGEERUANUBHARADWAJ^   9922 Conf TLs   180 Void TLs
LHB Rake; Loco SLR GS GS GS S1 S2 S3 S4 S5 S6 PC M1 M2 M3 M4 M5 M6 A1 A2 EOG
Rake Notes:


Mar 01 (11:58)   (previous value)
Timeline Entry# 6377658
by: TAGEERUANUBHARADWAJ^
LHB Rake; Loco SLR GS GS GS S1 S2 S3 S4 S5 S6 PC M1 M2 M3 M4 M5 M6 A1 A2 EOG
Rake Notes: Will be converted to LHB Rakes w.e.f 28th January 2024
New CC: 2 2A, 6 3E, 1 PC, 6 SL, 3 GS, 1 EOG, 1 SLR = 20 Coaches.
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy