The construction for alternative DC line begins!
As per the news received ,
The 28km new line will go through Chandrapura - Telo - Gomoh rail flyover bypass - Matari and merge in the grand chord
The project was sanctioned in August 2023 and supposed to be completed by March 2027
As per the news received ,
The 28km new line will go through Chandrapura - Telo - Gomoh rail flyover bypass - Matari and merge in the grand chord
The project was sanctioned in August 2023 and supposed to be completed by March 2027
22 Public Posts - Mon Mar 04, 2024
9 Public Posts - Tue Mar 05, 2024
As per the map of IR
The 28km line is the new line being built parallel to existing CRP - TELO section crossing GMO - MHQ line , bypassing GMO and merging in GC at MRQ
See the black dotted line in the attached picture and also in main post
The 28km line is the new line being built parallel to existing CRP - TELO section crossing GMO - MHQ line , bypassing GMO and merging in GC at MRQ
See the black dotted line in the attached picture and also in main post