Search Forum
Blog Entry# 5995066
Posted: Mar 12 (12:44)
19 Responses
Last Response: Mar 13 (17:26)
19 Responses
Last Response: Mar 13 (17:26)
It means the 22488/87 shall upgrade to 16 coach in near future or there would be possibility of more vb from asr?
14 Posts
not feasible. requires corrections. skipped SRE and gave LRJ stop. useless reversal at LRJ and HW section MPS is 60kmph. min. 1hr 10 mins is required to cover this section.
Existing ddn asr express has reversal in lakhshar so i though reversal is required unless i doenot give halt and u can see i give it technicsl hslt second thing i though untill introduction of that train secrion may upgrade that why i made lesser time
remove laksar nd add SRE. you skipped one of the main JN of this route. almost all trains divert from laksar south cabin. LRJ stop is useless.
ddn hw speed upgrade is not possible as it is completely forest area.
ddn hw speed upgrade is not possible as it is completely forest area.