Search Forum
Blog Entry# 6008611
Posted: Mar 25 (17:01)
3 Responses
Last Response: Mar 25 (19:21)
3 Responses
Last Response: Mar 25 (19:21)
Nidadavolu in Rajahmundry Vijayawada section is undergoing a major revamp in yard and trains services may be cancelled even long distance in July 2024. A video is posted in Myway Railway 3 days back which shows new track being laid from NDD outer towards left ( Parallel to present down line towrads Vijayawada) of the present line which starts at NDD road flyover which starts 1 km from station and further branches into 2 lines. A retaining wall in built abutting Eluru Canal and big trees cut there and continue through Railway gate upto station with PF 4 foundation. Even the present up and down line may see some change in alignment. Please watch the video for better understanding
Watches during premiere itself,It can be 3rd line and another called railway informer telugu said that it will be python loop and 4 and 5 pfs will constructed lets see which they want to construct