Search Forum
Blog Entry# 6017870
Posted: Apr 03 (16:43)
2 Responses
Last Response: Apr 04 (09:47)
2 Responses
Last Response: Apr 04 (09:47)
Apr 03 (16:43) IMG81412-123255/♥♥Ujjain Chennai Central T20 Sleeper Premium♥♥
2489 net green flags 11 green per TrainCustom Ratings
ER_PRAGADESH_SK_NGT^~
ER_PRAGADESH_SK_NGT^~ 232 img trains 206 popular2489 net green flags 11 green per TrainCustom Ratings
My first attempt to plot T20 VB sleeper premium train connecting Indore and Chennai.. I like to have ur views and constructive things.
Assumed 130 MPS in MAS AK. Made slow TT between AK and MHOW. then 110 MPS in MHOW to UJN via Dewas.
It drastrically reduce travel time between Indore, Ujjain to Vijayawada and Chennai.
Assumed 130 MPS in MAS AK. Made slow TT between AK and MHOW. then 110 MPS in MHOW to UJN via Dewas.
It drastrically reduce travel time between Indore, Ujjain to Vijayawada and Chennai.
1 Public Posts - Wed Apr 03, 2024
yes. after assessing MPS in GC section. it can speed up for 1 -1.5 hrs. as chennai Bhopal Chennai Jabalpur can be done in 25 hours, this also possible i feel