Search Forum
Blog Entry# 6032081
Posted: Apr 16 (10:29)
1 Responses
Last Response: Apr 16 (16:04)
1 Responses
Last Response: Apr 16 (16:04)
IR Affairs
SWR/South Western
Exynos9611~ 12824 news posts
Land acquisition delays, cost-sharing disputes hinder progressWith the demand for the speedy completion of the Tumakuru-Rayadurg railway line, which will enhance connectivity between Bengaluru and Ballari,...
read more... Karnataka-Andhra railway line stalled
In Tumkur Rayadurga line, Andhra portion line is already laid. Line upto Karnataka first station is done. If there is a will, there is a way.
Instead of blaming each other, all concerned are required to work together to complete TK RDG and TK CTA DVG lines. These 2 lines will change the travel map of Karnataka
Instead of blaming each other, all concerned are required to work together to complete TK RDG and TK CTA DVG lines. These 2 lines will change the travel map of Karnataka