Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Regular people go to see Taj Mahal. RailFans go to see Ghaziabad Jn. - Praveen

Search Forum
<<prev entry    next entry>>
Blog Entry# 6056429
Posted: May 07 (20:33)

No Responses Yet
Rail News
1430 views
0

IR Affairs
May 07 (20:33)   Saharsa-Howrah Vande Bharat Express to Launch in 5-6 Months, Bringing Direct Connectivity to Kosi Region

Exynos9611~   19577 news posts
Entry# 6056429         Tags   Past Edits
बिहार के इस रूट पर जल्द ही दौड़ेगी नई Vande Bharat Train, DRM ने नई वंदे भारत को लेकर दिया नया अपडेट

The Saharsa-Howrah Vande Bharat Express is expected to start operating in the next 5-6 months, offering direct travel from Saharsa to Howrah for the first time. Currently, passengers from Saharsa can only travel to Sealdah using the Hatia Bazar Express and then need to take another train to Howrah. The new...
more...
Vande Bharat Express will address this issue. Preparations for the Vande Bharat are in full swing. The maintenance, cleaning, and washing of the train will be done at the washing pit line 2 in Saharsa. To facilitate this, the second washing pit in Saharsa will be completed soon. The ongoing construction is facing delays due to a lack of variation approval, but the issue is being addressed through discussions with the Railway Board. Overheads Electric (OHE) facilities are being restored at the second washing pit in Saharsa to ensure smooth operation of the train. This includes adding a 430-volt supply and installing necessary equipment like cranes. The Vande Bharat Express will operate between Saharsa and Howrah at a speed of 110 km/h. Preparations for the train's operation will commence upon receiving directions from the Railway Board. The track work for the washing pit line is incomplete, and the absence of variation approval has slowed down the construction. This delay might affect the completion of the catwalk, pathway, hydrant, and electrical work in the 230-meter section. Without variation approval, the second washing pit will be limited to 590 meters. The Railway Board is expected to resolve the issue soon to ensure the timely operation of the Vande Bharat Express. The direct rail link between Saharsa and Howrah through the Vande Bharat Express will bring a new development to the Kosi region. It will not only improve transportation but also strengthen business and cultural ties, contributing to the region's economic and social progress.

Saharsa-Howrah Vande Bharat Express, agle 5-6 mahino mein chalna start ho jayega. Isse Kosi region ke logon ko pehli baar direct Saharsa se Howrah jaane ka mauka milega. Ab tak Saharsa se chalne wali Hatia Bazar Express, sirf Sealdah tak jaati thi. Howrah jaane ke liye dusri train le ni padti...
more...
thi. New Vande Bharat Express, is problem ko solve karega. Vande Bharat ki taiyaari full swing mein hai. Train ka maintenance, safai aur dhulai, Saharsa mein washing pit line 2 pe ki jaayegi. Iske liye Saharsa mein dusra washing pit bhi jaldi complete ho jayega. Construction mein variation approval na milne ki wajah se delay aa raha hai, lekin Railway Board se baat karke isko resolve kiya ja raha hai. Train ke operation se pehle, Saharsa ke dusre washing pit pe Overheads Electric (OHE) ki facility restore ki jaayegi. Isme 430-volt ka supply add kiya jaayega aur cranes jaise zaruri equipment install kiye jayenge. Vande Bharat Express, Saharsa aur Howrah ke beech 110 km/h ki speed se chalegi. Railway Board se directions milte hi train ke operation ki taiyaari start ho jayegi. Washing pit line ka track work abhi incomplete hai aur variation approval na milne ki wajah se construction slow ho gaya hai. Isse 230-meter section mein catwalk, pathway, hydrant, aur electrical work complete hone mein problem aa sakti hai. Variation approval na milne par, dusra washing pit sirf 590 meter lamba hi rahega. Railway Board se ummid hai ki jaldi hi is problem ka solution nikal jayega, taaki Vande Bharat Express time pe chalna start ho sake. Vande Bharat Express se Saharsa aur Howrah ke beech direct rail link banne se, Kosi region ke logon ko ek new development milega. Na sirf transport aasan hoga, balki business aur cultural relations bhi strong honge, jisse local area ki economic aur social progress mein bhi contribution hoga.
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy