Search Forum
Blog Entry# 6074540
Posted: May 24 (12:30)
3 Responses
Last Response: May 28 (12:00)
3 Responses
Last Response: May 28 (12:00)
Pitlines in various Coaching Depots in South Eastern Railway Railway Zone:
1. Shalimar Coaching Depot - 4 Pitlines
• Pitline-1 535m 24 ICF/22 LHB
• Pitline-2 535m 24 ICF/22 LHB
•...
more...
1. Shalimar Coaching Depot - 4 Pitlines
• Pitline-1 535m 24 ICF/22 LHB
• Pitline-2 535m 24 ICF/22 LHB
•...
more...
Wow, Hatia has 6 pit lines which can accommodate trains with 22 LHB coaches but daily originating long dist trains are quite less !!!
Hatia CDO maintain both Hatia & Ranchi bound trains both are having 40+ trains
Shalimar CDO have 4 full length pitlines but our IRI data shows all SER trains terminating at HWH/SHM/SRC undergo PM at either SRC/PDPK so are these 4 pitlines at SHM totally not utilized ?