Search Forum
Blog Entry# 6110090
Posted: Jun 30 (19:19)
4 Responses
Last Response: Jul 01 (21:23)
4 Responses
Last Response: Jul 01 (21:23)
Back to Back CRS in Jhansi-Mahoba section another 21km added with mauranipur-tehraka doubling. out of 138km, 42km added.
On 29.6.24 & 30.6.24, CRS NE Circle, Shri Pranjeev Saxena, along with CAO(C) Shri Vipin Kumar & DRM Shri Deepak Kumar Sinha conducted detailed inspection of the newly commissioned double line between Mauranipur-Tehraka over Jhansi Div, completed today with speed trial.
On 29.6.24 & 30.6.24, CRS NE Circle, Shri Pranjeev Saxena, along with CAO(C) Shri Vipin Kumar & DRM Shri Deepak Kumar Sinha conducted detailed inspection of the newly commissioned double line between Mauranipur-Tehraka over Jhansi Div, completed today with speed trial.
1 Public Posts - Sun Jun 30, 2024
2 Public Posts - Mon Jul 01, 2024