Search Forum
Blog Entry# 6110111
Posted: Jun 30 (19:36)
9 Responses
Last Response: Today (14:26)
9 Responses
Last Response: Today (14:26)
IR Affairs
SR/Southern
Exynos9611~ 12981 news posts
Kerala News: Kerala commuters are frustrated by the delay in introducing the Ernakulam-Bengaluru Vande Bharat Express, with an idle eight-coach rake in Kollam. Passengers rely on...
4 Posts
If it Gets Delayed Then Sr Should Give Lhb Coaches To Ers Sbc Exp
As per a video seen by me, production order has gone to ICF for the production of LWSCZ and LWSCZAC coaches for the same.
The train may get LHB within 3-4 months.
The train may get LHB within 3-4 months.
Mixed reports on this. Some news came few months ago that there are some issues in ERS pit line for accommodating and maintaining this train. Later on it was mentioned that it is sorted.Ths fastest train currently is taking 10.5 hrs.
With speed restrictions in ERS-SRR by pass stretch and then again in PGT-CBE stretch, the only place where train can attain maximum speed is between SRR bypass- to PGT and then CBE-SBC. Not sure if train can cover entire end to end journey in 8-9 hrs !! For the same rake to return , the TT might end up being very odd. We will have to wait and see. Not sure if VB sleeper will be introduced later in this route
With speed restrictions in ERS-SRR by pass stretch and then again in PGT-CBE stretch, the only place where train can attain maximum speed is between SRR bypass- to PGT and then CBE-SBC. Not sure if train can cover entire end to end journey in 8-9 hrs !! For the same rake to return , the TT might end up being very odd. We will have to wait and see. Not sure if VB sleeper will be introduced later in this route