Search Forum
Blog Entry# 6125516
Posted: Jul 14 (20:14)
2 Responses
Last Response: Jul 14 (20:41)
2 Responses
Last Response: Jul 14 (20:41)
Metro
BMRC/Bangalore Metro
Exynos9611~ 19517 news posts
Bengaluru metro expansion: Feasibility report for Tumakuru extension expected in 6 months
The Bengaluru Metro Rail Corporation Limited (BMRCL) is planning to extend its network to Tumakuru, with a feasibility study being conducted by RV Associates Architects Engineers and Consultants. The 52.41-kilometer project includes the potential for double-decker metro models in Phase 3. The study, costing ₹1.25 crore, will be completed by...
more...
more...
Bengaluru Metro Rail Corporation Limited (BMRCL) Tumakuru tak apna network extend karne ka plan bana raha hai, aur iske liye RV Associates Architects Engineers and Consultants ek feasibility study kar rahe hain. 52.41 kilometer ka yeh project Phase 3 mein double-decker metro model bhi include karta hai. ₹1.25 crore ka yeh...
more...
more...
Not required. Metro is not at all feasible and sensible for long distance. SWR is already thinking to quadruple Sbc Tk line for running Suburban trains its better