The TT of 12424/3 needs an overhaul.
With doubling in most part of its run, top priority , electrification and no reversals, the train is still running with its more than a decade old timings.
High time that the train is being run with more aggressive timings and schedule
With doubling in most part of its run, top priority , electrification and no reversals, the train is still running with its more than a decade old timings.
High time that the train is being run with more aggressive timings and schedule
5 Public Posts - Tue Aug 20, 2024
Absolutely ! It will be a new train only .
It should take the old 2.00pm departure time from NDLS and then can have early morning arrivals at key NF railheads of KIR NJP NCB NBQ GHY & onwards
It should take the old 2.00pm departure time from NDLS and then can have early morning arrivals at key NF railheads of KIR NJP NCB NBQ GHY & onwards