Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Regular people go to see Taj Mahal. RailFans go to see Ghaziabad Jn. - Praveen

Search Forum
<<prev entry    next entry>>
Blog Entry# 6165549
Posted: Aug 23 (05:58)

3 Responses
Last Response: Aug 23 (20:28)
Rail News
19804 views
3

New Facilities/Technology
CR/Central
Aug 23 (05:58)   Indian Railways Revises Vande Bharat Train Order: 80 Sets with 24 Coaches Each

Sameer2905^~   799 news posts
Entry# 6165549   News Entry# 566257         Tags   Past Edits
1 compliments
Useful
New Vande Bharat trains to have 24 coaches instead of 16; Indian Railways revises Rs 35,000 crore order; check key details

The Indian Railways has revised its Vande Bharat train order. Originally planned for 120 sets with 16 coaches each, the order has been changed to 80 sets with 24 coaches each. The first prototype of the new model is expected in September 2025, followed by the second in November. This new...
more...
train will be manufactured by Kinet Railway Solutions, a joint venture of RVNL, Metrowagonmash, and LES. The project aims to eventually produce 2,500 high-speed trains by 2047, replacing older train sets. The use of aluminium instead of steel is expected to improve speed and cost efficiency.

Indian Railways ne apne Vande Bharat train ke order mein badlaav kiya hai. Pehle, 120 sets banne the, har set mein 16 coaches the, lekin ab yeh order badal kar 80 sets ho gaya hai, aur har set mein 24 coaches honge. Is model ka pehla prototype September 2025 mein aayega,...
more...
aur dusra November mein. Yeh naya train Kinet Railway Solutions banayega, jo ki RVNL, Metrowagonmash, aur LES ka joint venture hai. Is project ka maqsad 2047 tak 2,500 high-speed trains banana hai, jiske saath hi purane train sets badal diye jayenge. Is mein steel ki jagah aluminium ka istemaal kiya jaayega, jisse speed aur cost efficiency mein sudhaar aayega.

1 Public Posts - Fri Aug 23, 2024

13354 views
1

Aug 23 (09:19)
deepak.yerr~
deepak.yerr~   6603 blog posts
Re# 6165549-5              
IR has changed the length of VB sleeper trains from 16 to 24 coaches and will include luggage vans, pantry car, may be restaurant seating car. So as pantry is included the design of the coach will be changed the present hot buffet arrangements in the coach will pave way for berths. The overall capacity of the train will increase considerable from the earlier 823 traveller berth to over 1200 which means a complete new design from the prototype being manufactured in BEML. The target date next Sep 2025 may be stretched to 2026 Q1 as the design has to start from scratch. The cost of the train set will increase from the present Rs 120 cr per trainset to 180cr which is not mentioned in the article. There is no clear information whether the L2 Titagarh has also been asked to change the specifications for 80 trainsets which has...
more...
already designed the concept, production procuremnt plan and target to roll out in July 2025. The tenders are already are old by an year and IR with RM changes specifications the project will be delayed which is to be on track in T20. (2020).

Translate to English
Translate to Hindi

1 Public Posts - Fri Aug 23, 2024
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy