Search Forum
Blog Entry# 6166680
Posted: Aug 24 (11:32)
60 Responses
Last Response: Sep 01 (08:22)
60 Responses
Last Response: Sep 01 (08:22)
Aug 24 (11:32) 19305/Dr. Ambedkar Nagar - Kamakhya Weekly Express (PT) | LKO/Lucknow Charbagh NR (9 PFs) | LDH/WAP-7/30626
thedemigod
thedemigod 314 blog postsEntry# 6166680 Tags Past Edits
Aug 25 2024 (01:19)
Loco Tag: LDH/WAP-7/30626 added by thedemigod/2264429
Aug 25 2024 (01:18)
Loco Tag: LDH/WAP-7 removed by Prefer Not To Say/2264429
Aug 24 2024 (18:22)
The original plan was to return via Ekatmata Express, but due to some unforeseen circumstances with my Thar, I had to return back from midway to the station
Aug 24 2024 (13:44)
½ hour of gained delay, even with a track-burning run, and a heavy slack in last 50km
Aug 24 2024 (11:36)
Loco Tag: LKO/WDG-3A added by thedemigod/2264429
Aug 24 2024 (11:36)
Loco Tag: GMO/WAG-9 added by thedemigod/2264429
Aug 24 2024 (11:36)
Loco Tag: LDH/WAP-7 added by thedemigod/2264429
Aug 24 2024 (11:36)
Station Tag: Varanasi Junction/BSB added by thedemigod/2264429
Aug 24 2024 (11:36)
Station Tag: Lucknow Charbagh NR/LKO added by thedemigod/2264429
Aug 24 2024 (11:36)
Train Tag: Prayagraj Sangam - Lucknow Intercity Express/14209 added by thedemigod/2264429
Aug 24 2024 (11:36)
Train Tag: Bagh Express/13020 added by thedemigod/2264429
Aug 24 2024 (11:36)
Train Tag: Lucknow Mail/12230 added by thedemigod/2264429
Aug 24 2024 (11:36)
Train Tag: Shaheed Express/14674 added by thedemigod/2264429
Aug 24 2024 (11:36)
Train Tag: Dr. Ambedkar Nagar - Kamakhya Weekly Express/19305 added by thedemigod/2264429
Loco Tag: LDH/WAP-7/30626 added by thedemigod/2264429
Aug 25 2024 (01:18)
Loco Tag: LDH/WAP-7 removed by Prefer Not To Say/2264429
Aug 24 2024 (18:22)
The original plan was to return via Ekatmata Express, but due to some unforeseen circumstances with my Thar, I had to return back from midway to the station
Aug 24 2024 (13:44)
½ hour of gained delay, even with a track-burning run, and a heavy slack in last 50km
Aug 24 2024 (11:36)
Loco Tag: LKO/WDG-3A added by thedemigod/2264429
Aug 24 2024 (11:36)
Loco Tag: GMO/WAG-9 added by thedemigod/2264429
Aug 24 2024 (11:36)
Loco Tag: LDH/WAP-7 added by thedemigod/2264429
Aug 24 2024 (11:36)
Station Tag: Varanasi Junction/BSB added by thedemigod/2264429
Aug 24 2024 (11:36)
Station Tag: Lucknow Charbagh NR/LKO added by thedemigod/2264429
Aug 24 2024 (11:36)
Train Tag: Prayagraj Sangam - Lucknow Intercity Express/14209 added by thedemigod/2264429
Aug 24 2024 (11:36)
Train Tag: Bagh Express/13020 added by thedemigod/2264429
Aug 24 2024 (11:36)
Train Tag: Lucknow Mail/12230 added by thedemigod/2264429
Aug 24 2024 (11:36)
Train Tag: Shaheed Express/14674 added by thedemigod/2264429
Aug 24 2024 (11:36)
Train Tag: Dr. Ambedkar Nagar - Kamakhya Weekly Express/19305 added by thedemigod/2264429
20 compliments
Great Great Great Great Great Great:write-up. Great:Playing with saloon and alcos 😂 Great Great Great Great Great Great Great Great Great Great Great Great Great
Great Great Great Great Great Great:write-up. Great:Playing with saloon and alcos 😂 Great Great Great Great Great Great Great Great Great Great Great Great Great
DADN-KYQ Express, NR/LKO ka Aatank.
So, for some urgent work, I had to return home to Varanasi from Lucknow. The original plan was to return via Ekatmata Express, but due to some unforeseen circumstances with my Thar, I had to return back from midway to the station.
So,...
more...
So, for some urgent work, I had to return home to Varanasi from Lucknow. The original plan was to return via Ekatmata Express, but due to some unforeseen circumstances with my Thar, I had to return back from midway to the station.
So,...
more...
another hour, another plan. The 19305, DADN-KYQ Express suited me the best, so I booked the tickets in current availability. Hopped on an Uber and that was the fastest commute in my entire journey, reached Charbagh from Ekana in just over 20 minutes.
The train was on time till Kanpur, and as soon as it entered NR, it instantly got late. Still, I hoped the delay would not exceed 45 minutes. But the great NR/LKO. They were playing with a GM saloon and two ALCos on the PF-2 where the train was supposed to be received.
Shaheed Express was taken on the vacant PF-3 first, and when the ALCos finally got done with the parking simulator, Bagh Express was received on PF-2. And while it was a pleasant surprise to see coach display indicators on LKO, they were working with a mind of their own. Data of my still nowhere to be seen train was displayed while Bagh was on PF-2. And that of Shaheed started being displayed after it's departure.
Finally, after a delay of 1.5 hours, the train arrived on PF-3 and departed after accumulating a few more minutes of delay. But here comes something I hadn't expected from NR/LKO even in my dreams. The train reached SLN in around 1hr 20min, averaging more than 100kmph. And covered SLN-JOP in around 50 minutes, again an average of 100kmph. Now I was sure, we'd reach Varanasi before 11:30.
And then started typical NR behavior. The train was halted at every station to let the freights gain some progress, even though we were still late, officially. And finally the train was halted at Babatpur because operational block was taken. A totally avoidable situation, had they run the train on the schedule it was running.
The train halted there for almost an hour. Another block was scheduled if the previous one didn't work (they were welding the tracks), and exactly the same thing happened. But somehow we were allowed to proceed, supposedly because the train was full of people appearing for some exam, and they got agitated. The train was halted yet again at Shivpur and Varanasi outers.
At this point I was so annoyed, I deboarded and started walking towards the station. I boarded back when the train started crawling towards the station. Finally it reached BSB around 2 hours late. ½ hour of gained delay, even with a track-burning run, and a heavy slack in last 50km.
You can trust a wolf to guard the sheep, but can't trust NR to reach somewhere on time. Attached here are some pictures I took while waiting for my train. Well, except for the train I was traveling in.
P.S. Farakka is still displayed as MLDT-NDLS at BSB. And while the train boards are still printed and handwritten, CDO/KIR has taken extra steps to paint ER again wherever it had been peeled off. They're surely reading some blogs here.
Kumud.
The train was on time till Kanpur, and as soon as it entered NR, it instantly got late. Still, I hoped the delay would not exceed 45 minutes. But the great NR/LKO. They were playing with a GM saloon and two ALCos on the PF-2 where the train was supposed to be received.
Shaheed Express was taken on the vacant PF-3 first, and when the ALCos finally got done with the parking simulator, Bagh Express was received on PF-2. And while it was a pleasant surprise to see coach display indicators on LKO, they were working with a mind of their own. Data of my still nowhere to be seen train was displayed while Bagh was on PF-2. And that of Shaheed started being displayed after it's departure.
Finally, after a delay of 1.5 hours, the train arrived on PF-3 and departed after accumulating a few more minutes of delay. But here comes something I hadn't expected from NR/LKO even in my dreams. The train reached SLN in around 1hr 20min, averaging more than 100kmph. And covered SLN-JOP in around 50 minutes, again an average of 100kmph. Now I was sure, we'd reach Varanasi before 11:30.
And then started typical NR behavior. The train was halted at every station to let the freights gain some progress, even though we were still late, officially. And finally the train was halted at Babatpur because operational block was taken. A totally avoidable situation, had they run the train on the schedule it was running.
The train halted there for almost an hour. Another block was scheduled if the previous one didn't work (they were welding the tracks), and exactly the same thing happened. But somehow we were allowed to proceed, supposedly because the train was full of people appearing for some exam, and they got agitated. The train was halted yet again at Shivpur and Varanasi outers.
At this point I was so annoyed, I deboarded and started walking towards the station. I boarded back when the train started crawling towards the station. Finally it reached BSB around 2 hours late. ½ hour of gained delay, even with a track-burning run, and a heavy slack in last 50km.
You can trust a wolf to guard the sheep, but can't trust NR to reach somewhere on time. Attached here are some pictures I took while waiting for my train. Well, except for the train I was traveling in.
P.S. Farakka is still displayed as MLDT-NDLS at BSB. And while the train boards are still printed and handwritten, CDO/KIR has taken extra steps to paint ER again wherever it had been peeled off. They're surely reading some blogs here.
Kumud.
please wait...Translate to English
please wait...Translate to Hindi
DADN-KYQ Express, NR/LKO ka Aatank.
To bhai kuch urgent kaam ki wajah se, mujhe Lucknow se Varanasi ghar wapas jaana pad raha tha. Plan to original Ekatmata Express se return karne ka tha, par mere Thar mein kuch anjaane halat ki wajah se, station ke beech se wapas lautna pada.
To phir ek aur ghanta, ek aur plan. 19305, DADN-KYQ Express mujhe sabse better laga, to maine tickets book kar diya current availability mein. Uber pe chadha aur yeh mera fastest commute tha poora safar mein, 20 minute mein Ekana se Charbagh pahunch gaya.
Train Kanpur tak time pe thi, par jaise hi NR mein enter hui, late hona shuru ho gayi. Phir bhi, maine umeed ki 45 minutes se jyada delay na ho. Par NR/LKO ne keh diya "No way". Unhone GM saloon aur do ALCos ke saath khela PF-2 mein jahan train receive honi thi.
Shaheed Express pehle vacant PF-3 pe gayi, aur jab ALCos finally parking simulator se free ho gaye, Bagh Express PF-2 pe receive ki gayi. Aur jab mujhe LKO pe coach display indicators dikhe, woh apna alag dimag chalane lage the. Meri train ka data dikha rahe the jab tak Bagh PF-2 pe thi. Shaheed ka display hua jab woh chali gayi.
Ant mein, 1.5 ghante delay ke baad, train aayi PF-3 pe aur chali gayi ek aur kuch minutes delay accumulate karke. Par yahaan aaya ek unexpected twist NR/LKO ka. Train pahunch gayi SLN mein 1 ghante 20 minute mein, averaging 100kmph se zyada. Aur SLN-JOP mein around 50 minutes mein, phir se average 100kmph. Ab main sure tha ki 11:30 se pehle pahunch jayenge Varanasi.
Phir shuru hui typical NR behaviour. Train roki har station pe taki freight trains thoda progress kar sake, bina kisi reason ke hote hue late. Aur ant mein train roki Babatpur mein kyonki operational block tha. Ek poori tarah avoidable situation, agar woh train schedule pe chalate.
Train wahaan lagbhag ek ghante ke liye ruki. Agar pehla block kaam nahi karta to dusra tha schedule par, aur bilkul waisa hi hua. Par somehow humein aage jaane diya, kyunki train bharpoor logon se bhari thi jo kisi exam ke liye ja rahe the, aur unka gussa tha. Train fir roki Shivpur aur Varanasi ke outskirts mein.
Is point pe main itna pareshan ho gaya tha, ki main gaadi se utar ke station ki taraf chal pada. Wapas chadha jab train dheere gaadi chalane lagi station ki taraf. Ant mein BSB pahunchi lagbhag 2 ghante late. ½ ghante ka delay bhara, tab bhi chalai jaa rahi thi train, aur last 50km mein heavy slack tha.
Ek sher ko samajh sakte ho ki bakriyon ka dhyan rakh sakta hai, par NR pe bharosa nahi hai ki samay pe kahin pahunch payega. Yahaan kuch tasveerein hain jo maine apni train ka intezaar karte hue li. Well, train ke alawa jisme main safar kar raha tha.
P.S. Farakka ab bhi BSB mein MLDT-NDLS ke naam se dikha ja raha hai. Aur jabki train boards ab bhi printed aur handwritten hain, CDO/KIR ne extra steps liye hain paint karne ke liya ER ko wapas jahan se peel off hua tha. Yeh log yahaan kuch blogs padh rahe hain, sure hai.
Kumud.
To bhai kuch urgent kaam ki wajah se, mujhe Lucknow se Varanasi ghar wapas jaana pad raha tha. Plan to original Ekatmata Express se return karne ka tha, par mere Thar mein kuch anjaane halat ki wajah se, station ke beech se wapas lautna pada.
To phir ek aur ghanta, ek aur plan. 19305, DADN-KYQ Express mujhe sabse better laga, to maine tickets book kar diya current availability mein. Uber pe chadha aur yeh mera fastest commute tha poora safar mein, 20 minute mein Ekana se Charbagh pahunch gaya.
Train Kanpur tak time pe thi, par jaise hi NR mein enter hui, late hona shuru ho gayi. Phir bhi, maine umeed ki 45 minutes se jyada delay na ho. Par NR/LKO ne keh diya "No way". Unhone GM saloon aur do ALCos ke saath khela PF-2 mein jahan train receive honi thi.
Shaheed Express pehle vacant PF-3 pe gayi, aur jab ALCos finally parking simulator se free ho gaye, Bagh Express PF-2 pe receive ki gayi. Aur jab mujhe LKO pe coach display indicators dikhe, woh apna alag dimag chalane lage the. Meri train ka data dikha rahe the jab tak Bagh PF-2 pe thi. Shaheed ka display hua jab woh chali gayi.
Ant mein, 1.5 ghante delay ke baad, train aayi PF-3 pe aur chali gayi ek aur kuch minutes delay accumulate karke. Par yahaan aaya ek unexpected twist NR/LKO ka. Train pahunch gayi SLN mein 1 ghante 20 minute mein, averaging 100kmph se zyada. Aur SLN-JOP mein around 50 minutes mein, phir se average 100kmph. Ab main sure tha ki 11:30 se pehle pahunch jayenge Varanasi.
Phir shuru hui typical NR behaviour. Train roki har station pe taki freight trains thoda progress kar sake, bina kisi reason ke hote hue late. Aur ant mein train roki Babatpur mein kyonki operational block tha. Ek poori tarah avoidable situation, agar woh train schedule pe chalate.
Train wahaan lagbhag ek ghante ke liye ruki. Agar pehla block kaam nahi karta to dusra tha schedule par, aur bilkul waisa hi hua. Par somehow humein aage jaane diya, kyunki train bharpoor logon se bhari thi jo kisi exam ke liye ja rahe the, aur unka gussa tha. Train fir roki Shivpur aur Varanasi ke outskirts mein.
Is point pe main itna pareshan ho gaya tha, ki main gaadi se utar ke station ki taraf chal pada. Wapas chadha jab train dheere gaadi chalane lagi station ki taraf. Ant mein BSB pahunchi lagbhag 2 ghante late. ½ ghante ka delay bhara, tab bhi chalai jaa rahi thi train, aur last 50km mein heavy slack tha.
Ek sher ko samajh sakte ho ki bakriyon ka dhyan rakh sakta hai, par NR pe bharosa nahi hai ki samay pe kahin pahunch payega. Yahaan kuch tasveerein hain jo maine apni train ka intezaar karte hue li. Well, train ke alawa jisme main safar kar raha tha.
P.S. Farakka ab bhi BSB mein MLDT-NDLS ke naam se dikha ja raha hai. Aur jabki train boards ab bhi printed aur handwritten hain, CDO/KIR ne extra steps liye hain paint karne ke liya ER ko wapas jahan se peel off hua tha. Yeh log yahaan kuch blogs padh rahe hain, sure hai.
Kumud.
11 Public Posts - Sat Aug 24, 2024
15 Public Posts - Sun Aug 25, 2024
9344 views
6
★
thedemigod
thedemigod 314 blog postsRe# 6166680-27 Past Edits
Aug 25 2024 (19:34)
While I agree to most points, but talking about LKO/NR, I'm referring to the zone init's its entirety, not the station itself
Andstill still, they haven't managed to even prepare a DPR
Main The main issue lies at Manak Nagar and Malhaur due to the crossing over with NER
But NR's lackluster attitude is the mainissue, issue it's like they don't even want to work until things get out of hand
It's like they don't even want to work until things get out of hand
Also, I agreeroute that till the routes until a few stations after major junctions should be in a single zone/division
But crossover stations like Manak Nagar, Chheoki, Malhaur,etc etc, will always remain an issue until RoRs are constructed like Tundla
Because crossovers will be slow and will occupy one waytill until it's complete
BSB isn't doing anybetter, better even the trains keep getting extended
Even the trains keep getting extended
Ayodhya still looks like a station from the past if you deboard on the other side of the PF
Coming to PRYJ, even DDU, they handle the trunkroute, route and a lot of trains, trains without any political representation
While BSB/LKO/AY, they're still making planswhat that will suit them the most
While I agree to most points, but talking about LKO/NR, I'm referring to the zone in
And
But NR's lackluster attitude is the main
It's like they don't even want to work until things get out of hand
Also, I agree
But crossover stations like Manak Nagar, Chheoki, Malhaur,
Because crossovers will be slow and will occupy one way
BSB isn't doing any
Even the trains keep getting extended
Ayodhya still looks like a station from the past if you deboard on the other side of the PF
Coming to PRYJ, even DDU, they handle the trunk
While BSB/LKO/AY, they're still making plans
2 compliments
Useful Agree
Useful Agree
While I agree to most points, but talking about LKO/NR, I'm referring to the zone in its entirety, not the station itself.
NR definitely works to address the issues, but only after it's too late to swiftly handle the situation. It's not about political will, BSB is the main station of PM's constituency. And they still haven't figured out how to manage the traffic smoothly, even after the yard remodeling. They've created more issues than they've addressed.
...
more...
NR definitely works to address the issues, but only after it's too late to swiftly handle the situation. It's not about political will, BSB is the main station of PM's constituency. And they still haven't figured out how to manage the traffic smoothly, even after the yard remodeling. They've created more issues than they've addressed.
...
more...
I've been reading about the 'signature bridge' parallel to Malviya bridge and Vyasnagar quadrupling almost daily in the newspapers, for years now. And still, they haven't managed to even prepare a DPR. And the tracks still seem like they're from the steam era.
Dilkusha and Utraitia usually get long halts due to huge slacks. Which I'm pretty much sure can be managed given the track-burning run I witnessed. The main issue lies at Manak Nagar and Malhaur due to the crossing over with NER. But NR's lackluster attitude is the main issue. It's like they don't even want to work until things get out of hand.
Also, I agree that the routes until a few stations after major junctions should be in a single zone/division. Like NCR did with Anwarganj. It'll make departures seamless. But crossover stations like Manak Nagar, Chheoki, Malhaur, etc, will always remain an issue until RoRs are constructed like Tundla. Because crossovers will be slow and will occupy one way until it's complete.
Lucknow is the state capital and divisional HQ of two divisions of two different zones. It should be at par of other such places, if not better. BSB isn't doing any better. Even the trains keep getting extended. Within the same city, BSBS and BCY have progressed quite a lot from what they used to be. Ayodhya still looks like a station from the past if you deboard on the other side of the PF. Tracks still feel like the train will derail if it goes any faster. Things are improving, but a lot slower than they should have.
Coming to PRYJ, even DDU, they handle the trunk route and a lot of trains without any political representation. They're upgrading their routes, now to 160kmph, signaling and their yards constantly, even after the saturation and superfast TTs. Even the passenger amenities have come a long way at these places. While BSB/LKO/AY, they're still making plans that will suit them the most.
please wait...Translate to English
please wait...Translate to Hindi
1 Public Posts - Sun Aug 25, 2024
2 Public Posts - Tue Aug 27, 2024
14 Public Posts - Wed Aug 28, 2024
3 Public Posts - Thu Aug 29, 2024
7 Public Posts - Fri Aug 30, 2024
5 Public Posts - Sat Aug 31, 2024
1 Public Posts - Sun Sep 01, 2024