Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

कोशी का प्रवेश द्वार — मानसी जं० - Prabhat Sharan

Search Forum
<<prev entry    next entry>>
Blog Entry# 6166680
Posted: Aug 24 (11:32)

60 Responses
Last Response: Sep 01 (08:22)
1 Followers
General Travel
131355 views
32

★★★
Aug 24 (11:32)   19305/Dr. Ambedkar Nagar - Kamakhya Weekly Express (PT) | LKO/Lucknow Charbagh NR (9 PFs) | LDH/WAP-7/30626
thedemigod
thedemigod   314 blog posts
Entry# 6166680            Tags   Past Edits
20 compliments
Great Great Great Great Great Great:write-up. Great:Playing with saloon and alcos 😂 Great Great Great Great Great Great Great Great Great Great Great Great Great
DADN-KYQ Express, NR/LKO ka Aatank.

So, for some urgent work, I had to return home to Varanasi from Lucknow. The original plan was to return via Ekatmata Express, but due to some unforeseen circumstances with my Thar, I had to return back from midway to the station.

So,
...
more...
another hour, another plan. The 19305, DADN-KYQ Express suited me the best, so I booked the tickets in current availability. Hopped on an Uber and that was the fastest commute in my entire journey, reached Charbagh from Ekana in just over 20 minutes.

The train was on time till Kanpur, and as soon as it entered NR, it instantly got late. Still, I hoped the delay would not exceed 45 minutes. But the great NR/LKO. They were playing with a GM saloon and two ALCos on the PF-2 where the train was supposed to be received.

Shaheed Express was taken on the vacant PF-3 first, and when the ALCos finally got done with the parking simulator, Bagh Express was received on PF-2. And while it was a pleasant surprise to see coach display indicators on LKO, they were working with a mind of their own. Data of my still nowhere to be seen train was displayed while Bagh was on PF-2. And that of Shaheed started being displayed after it's departure.

Finally, after a delay of 1.5 hours, the train arrived on PF-3 and departed after accumulating a few more minutes of delay. But here comes something I hadn't expected from NR/LKO even in my dreams. The train reached SLN in around 1hr 20min, averaging more than 100kmph. And covered SLN-JOP in around 50 minutes, again an average of 100kmph. Now I was sure, we'd reach Varanasi before 11:30.

And then started typical NR behavior. The train was halted at every station to let the freights gain some progress, even though we were still late, officially. And finally the train was halted at Babatpur because operational block was taken. A totally avoidable situation, had they run the train on the schedule it was running.

The train halted there for almost an hour. Another block was scheduled if the previous one didn't work (they were welding the tracks), and exactly the same thing happened. But somehow we were allowed to proceed, supposedly because the train was full of people appearing for some exam, and they got agitated. The train was halted yet again at Shivpur and Varanasi outers.

At this point I was so annoyed, I deboarded and started walking towards the station. I boarded back when the train started crawling towards the station. Finally it reached BSB around 2 hours late. ½ hour of gained delay, even with a track-burning run, and a heavy slack in last 50km.

You can trust a wolf to guard the sheep, but can't trust NR to reach somewhere on time. Attached here are some pictures I took while waiting for my train. Well, except for the train I was traveling in.

P.S. Farakka is still displayed as MLDT-NDLS at BSB. And while the train boards are still printed and handwritten, CDO/KIR has taken extra steps to paint ER again wherever it had been peeled off. They're surely reading some blogs here.

Kumud.

Translate to English
Translate to Hindi

11 Public Posts - Sat Aug 24, 2024

15 Public Posts - Sun Aug 25, 2024

9344 views
6

Aug 25 (19:31)
thedemigod
thedemigod   314 blog posts
Re# 6166680-27               Past Edits
2 compliments
Useful Agree
While I agree to most points, but talking about LKO/NR, I'm referring to the zone in its entirety, not the station itself.

NR definitely works to address the issues, but only after it's too late to swiftly handle the situation. It's not about political will, BSB is the main station of PM's constituency. And they still haven't figured out how to manage the traffic smoothly, even after the yard remodeling. They've created more issues than they've addressed.
...
more...

I've been reading about the 'signature bridge' parallel to Malviya bridge and Vyasnagar quadrupling almost daily in the newspapers, for years now. And still, they haven't managed to even prepare a DPR. And the tracks still seem like they're from the steam era.

Dilkusha and Utraitia usually get long halts due to huge slacks. Which I'm pretty much sure can be managed given the track-burning run I witnessed. The main issue lies at Manak Nagar and Malhaur due to the crossing over with NER. But NR's lackluster attitude is the main issue. It's like they don't even want to work until things get out of hand.

Also, I agree that the routes until a few stations after major junctions should be in a single zone/division. Like NCR did with Anwarganj. It'll make departures seamless. But crossover stations like Manak Nagar, Chheoki, Malhaur, etc, will always remain an issue until RoRs are constructed like Tundla. Because crossovers will be slow and will occupy one way until it's complete.

Lucknow is the state capital and divisional HQ of two divisions of two different zones. It should be at par of other such places, if not better. BSB isn't doing any better. Even the trains keep getting extended. Within the same city, BSBS and BCY have progressed quite a lot from what they used to be. Ayodhya still looks like a station from the past if you deboard on the other side of the PF. Tracks still feel like the train will derail if it goes any faster. Things are improving, but a lot slower than they should have.

Coming to PRYJ, even DDU, they handle the trunk route and a lot of trains without any political representation. They're upgrading their routes, now to 160kmph, signaling and their yards constantly, even after the saturation and superfast TTs. Even the passenger amenities have come a long way at these places. While BSB/LKO/AY, they're still making plans that will suit them the most.

Translate to English
Translate to Hindi

1 Public Posts - Sun Aug 25, 2024

2 Public Posts - Tue Aug 27, 2024

14 Public Posts - Wed Aug 28, 2024

3 Public Posts - Thu Aug 29, 2024

7 Public Posts - Fri Aug 30, 2024

5 Public Posts - Sat Aug 31, 2024

1 Public Posts - Sun Sep 01, 2024
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy