Search Forum
Blog Entry# 6174785
Posted: Aug 31 (23:45)
2 Responses
Last Response: Sep 01 (00:01)
2 Responses
Last Response: Sep 01 (00:01)
Final Location survey including DPR preparation er tender bereyeche
1) Khana - Sainthia 4th line (84.10 km)
2)Masagram Flyover (5 km)
3) Katwa bypass connection (10 km)
4)...
more...
1) Khana - Sainthia 4th line (84.10 km)
2)Masagram Flyover (5 km)
3) Katwa bypass connection (10 km)
4)...
more...
Bardhaman byepass r Andal byepass ei duto game changer hobe.
Alternative route pawa jabe r DGR/UDL er load kome jabe
Alternative route pawa jabe r DGR/UDL er load kome jabe
If Katwa Bypass is completed then Azimganj, Katwa route will get south India connection as it can link both HB Chord & HB Main line