Search Forum
Blog Entry# 6184502
Posted: Sep 10 (07:11)
No Responses Yet
No Responses Yet
Metro
UPMRCL/Kanpur Metro
AdittyaaSharma^~ 73876 news posts
मेट्रो कॉरिडोर-दो का कंपनीबाग में पहला पियर कैप्स रखा
The first pier cap for the Kanpur Metro's elevated section from CSA to Barra-8 was installed on Monday at pillar number 14 near Company Bagh Crossing. This 4.5 km long section will have 121 pier caps and five stations: Agricultural University, Vijay Nagar Crossing, Shastri Chowk, Barra-7 and Barra-8. The installation...
more...
more...
Kanpur Metro ke CSA se Barra-8 tak ke elevated section mein pehla pier caps Company Bagh Crossing ke paas pillar number 14 pe Monday ko rakha gaya. Yah 4.5 km lamba section mein 121 pier caps aur 5 stations honge: Krishi Vishwavidyalaya, Vijay Nagar Chauraha, Shastri Chowk, Barra-7 aur Barra-8. ...
more...
more...