Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Tamil Nadu Express - எங்கள் உயிர் துடிப்பு - Vijay Baradwaj

Search Forum
<<prev entry    next entry>>
Blog Entry# 6202071
Posted: Sep 26 (19:04)

No Responses Yet
Rail News
982 views
0

IR Affairs
SR/Southern
Sep 26 (19:04)   Chennai's Long-Awaited Pattabiram ROB Partially Opens, Bringing Relief to Commuters

Exynos9611~   21042 news posts
Entry# 6202071         Tags   Past Edits
20-year wait ends as Pattabiram ROB partially opened in Chennai

The partially opened Road Over Bridge (ROB) in Pattabiram, Chennai, after six years of construction, provides relief to commuters and residents. This two-lane section of the four-lane bridge, built over level crossing gate 2 between Pattabiram and Pattabiram Military siding stations, facilitates two-way traffic between Avadi and Thiruninravur. This 11-meter wide...
more...
and 780-meter long bridge addresses a 20-year-old need in the area. The ROB was constructed at a cost of Rs 55 crore. The remaining work, including a 4-meter-long flyover above the railway line, will commence after closing the level crossing. Additionally, a roundabout near the Pattabiram police station is planned with land acquisition already completed. Local activist T Sadagopan highlighted the previous detour of 6-7 km that residents had to take, leading to a 45-minute delay in crossing the level crossing gate. He also mentioned the loss of connectivity due to the cancellation of MTC buses during the ROB construction and requested the restoration of bus routes that existed before 2017-18.

Chennai ke Pattabiram mein ban raha Road Over Bridge (ROB) ab aakhirkar khul gaya hai, yeh 6 saal se ban raha tha! Ab commuters aur western suburbs ke residents ko rahat mili hai. Yeh four-lane ROB ka do lane wala section hai, yeh level crossing gate 2 ke upar banaya gaya...
more...
hai, Pattabiram aur Pattabiram Military siding stations ke beech mein. Isse Avadi aur Thiruninravur ke beech mein do-way traffic chalega. Yeh bridge 11 meter chauda aur 780 meter lamba hai, yeh area ke residents ki 20 saal purani demand ko pura karega. ROB 55 crore rupees mein banaya gaya hai. Baki ka kaam, jaise ki railway line ke upar 4 meter lamba flyover, level crossing band hone ke baad hi shuru hoga. Pattabiram police station ke paas ek roundabout bhi banne wala hai, jiske liye land acquisition poora ho chuka hai. Local activist T Sadagopan ne bataya ki pehle residents ko 6-7 km ka detour karna padta tha, jisse level crossing gate ko cross karne mein 45 minute lagte the. Unhone yeh bhi bataya ki ROB banne ki wajah se MTC buses cancel ho gaye the, jisse alag alag areas ki connectivity kharab ho gayi. Unhone yeh bhi kaha ki 2017-18 ke pehle chalne wale saare bus routes ko phir se start karna chahiye.
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy