Search Forum
Blog Entry# 646570
Posted: Jan 20 2013 (09:00)
8 Responses
Last Response: Jan 20 2013 (09:55)
8 Responses
Last Response: Jan 20 2013 (09:55)
Trail run of Engine & Train was successfull over Pamban Bridge..The service to RMM is resumed from Today...
The Pic Shows Empty rake from RMM crossing the bridge for trial run..
The Pic Shows Empty rake from RMM crossing the bridge for trial run..
3 Posts
not upgradation fully...in the place of damaged pillar new concrete pillar is going to be constructed....
It is a great relief 2 c that this heritage bridge was intact and the damage was less.
Nice pic
Nice pic
ya its enough..they checked other pillars to see any damage or cracks using a spl type of camera in sub-marine..but other pillars remains safety..so pier no.121 is going to be replaced...now on temporary basis steel grill is supported