Search Forum
Blog Entry# 66177
Posted: Aug 24 2010 (14:07)
22 Responses
Last Response: Nov 13 2010 (07:27)
22 Responses
Last Response: Nov 13 2010 (07:27)
superb train no doubt, but can be better off with the following-
1. staff on board should have trolleys to serve food alike rajdhanis, should not carry trays on their laps.that looks v ugly
2. tea should be served with a tray at least
3. try some other dish in place of a tomato soup prior to lunch.breakfast can be made a bit heavy-serve...
more...
1. staff on board should have trolleys to serve food alike rajdhanis, should not carry trays on their laps.that looks v ugly
2. tea should be served with a tray at least
3. try some other dish in place of a tomato soup prior to lunch.breakfast can be made a bit heavy-serve...
more...
26 Posts
WAP5s are highly upgradable. As of now, their rated speed is 160 km/h. By improving the gear ratio of those locomotives and changing the software, their MPS can be increased from 160 km/h to 200 km/h.
this train gets a HWH wap4 instead of SRC unlike all other ser trains.
What is tractive effort? Co-Co... all these technical things.. Can somebody please provide layman answers..
I would be very grateful.
Good wishes.
I would be very grateful.
Good wishes.