Search Forum
Blog Entry# 699095
Posted: Mar 20 2013 (15:14)
8 Responses
Last Response: Mar 20 2013 (21:02)
8 Responses
Last Response: Mar 20 2013 (21:02)
I Never Saw this train on it's schedule time always delayed by Two to Twelve Hours I think ECR have to think about its punctuality From Islampur to New Delhi. If you have a opportunity to rename this train so whats ur new Name Will Be????
3 Posts
Remedy.
1. Needs to be provided an extra rake, even if they extend it a little more, say upto Hisar or Ambala.
2. Train may be shifted to ECR and made an late night train, i.e. Starting at IPR at around 8 PM so that it never comes in the way of Rajdhani's passing through the main line.
1. Needs to be provided an extra rake, even if they extend it a little more, say upto Hisar or Ambala.
2. Train may be shifted to ECR and made an late night train, i.e. Starting at IPR at around 8 PM so that it never comes in the way of Rajdhani's passing through the main line.
When this train became NR train the Shramjeevi became ECR train in return.
OK, then not possible, but extra rake is an possibility after extension and TT change. But the controllers in Ald-Mgs section need to be tightened for better running..
ald aur mgs ke beech me bullet train bhi chaley to ye log usey bhi late kar dengey
Sahi baat hai, is section me sirf, Rajdhani/ Shatabdi/ Garib Rath aur Duranto trains ko hi preference milti hai, baki sab trains suffer karti hai.. Pata nahi kya problem hai waha, jise ki sudhara nahi jaa sakta.. aisa last 1 month me kai bar hua hai ki sampoorna Kranti before time Ald pahuchi hai, par Mgs pahuchate-Pahuchate 2 ghante late ho jaati hai.. Mai ab tak teen br greviance register kara chuka hu, par koi fayda nahi..