Search Forum
Blog Entry# 705832
Posted: Mar 26 2013 (22:43)
2 Responses
Last Response: Mar 26 2013 (23:03)
2 Responses
Last Response: Mar 26 2013 (23:03)
How TEN JAT Coaches coupled to this train in Erode. Any know know Coupling process of this train, please explain. Interested to know.
TEN-JAT will come on its route from Tirunelveli till Erode and wait for Navyug/Himsagar to arrive-It gets a Erode shed Diesel engien which will be detahced here -After Navyug/Himsagar arrives, the incoming engine will detach, join with the waiting coach, and tak eit back to attach to the Navyug/Himsagar rake and forward journey will continue
See teh coach composision-You can see A2 in start whereas A1 at the end-A2 comes with the Tirunelveli portion and gets attached at Erode whereas A1 and B1 come from theri destinations-SLR to S6 after the loco comes with the link Express
See teh coach composision-You can see A2 in start whereas A1 at the end-A2 comes with the Tirunelveli portion and gets attached at Erode whereas A1 and B1 come from theri destinations-SLR to S6 after the loco comes with the link Express
If anyone having Video pls upload here. Explain elaborately friend. I can't understand.