Search Forum
Blog Entry# 747774
Posted: May 09 2013 (18:39)
3 Responses
Last Response: May 10 2013 (00:36)
3 Responses
Last Response: May 10 2013 (00:36)
as per offical site,it is running with 3 scnd ac
6 thrd ac and 14 sleeper..
Then if add pc and 2 general coaches.
It adds up to 26..
So is this train with maximum...
more...
6 thrd ac and 14 sleeper..
Then if add pc and 2 general coaches.
It adds up to 26..
So is this train with maximum...
more...
ohh..
Even for punjab mail offical site it is showing 12ac coaches.
Mumbai rajdhani with 13 3ac coaches..
Even for punjab mail offical site it is showing 12ac coaches.
Mumbai rajdhani with 13 3ac coaches..
e1 for gujarath mail it is showing wrong
i think for almost all trains the official site add 1 or more coaches than the actual !!
i think for almost all trains the official site add 1 or more coaches than the actual !!