Search Forum
Blog Entry# 784874
Posted: Jun 16 2013 (17:02)
39 Responses
Last Response: Jun 16 2013 (20:30)
39 Responses
Last Response: Jun 16 2013 (20:30)
there is scope for augmentation of Devgiri exp with 1 SL, 1 3A and 1 gen. this will total the length to 24 coaches. augmentation is very much needed.
37 Public Posts - Sun Jun 16, 2013
Once devgiri was hauled by GY WDG-4 twins..major offlink.probably to send locos towards KYN or something..but I hope Ajanta and devgiri get GY WDP-4D soon if possible..
1 Public Posts - Sun Jun 16, 2013