Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

22222/22221-->Aapli Rajdhani, Asli VIP number waali - Somanko

Search Forum
<<prev entry    next entry>>
Blog Entry# 788470
Posted: Jun 20 2013 (20:41)

8 Responses
Last Response: Jun 22 2013 (21:31)
1 Followers
General Travel
2172 views
2

Jun 20 2013 (20:41)   KYN/Kalyan Junction (8 PFs)
 
Msg_For_Train_Bookings^~
Msg_For_Train_Bookings^~   21041 blog posts
Entry# 788470            Tags   Past Edits
Glimmer of hope for CR commuters!
Very confusing article, DC-AC conversion on KYN-TNA-LTT stretch may get completed on 30th if weather gods allow so (JUST HOPE)... :)
.
CR claims that life will become easier for commuters from the distant suburbs with all trains switching from DC to AC between Kurla and Kalyan from June 30
.
...
more...

“The commissioner of railway safety will be conducting an inspection on June 21, 22 and 23 a finally test charge will be conducted on the night of 29 after which the Kurla to Kalyan will turn into AC traction,” said an official, who did not want to be named."
.
"Although the system will be helpful for the commuters many CR officials say that switching to AC is a big task in normal weather and almost impossible in the monsoon period.
A railway official on the condition of anonymity said, “I do not think that the monsoon deadline is a practical, the safety inspection have been delayed earlier too and it unlikely that they will happen in these weather conditions.”
.
“In order to run the train safely CR will have to raise the height of Matunga foot overbridge north end and Kasaiwada foot overbridge in the south end of Kurla which is to low to carry the AC traction,” Added the official.
The height required to run AC traction is 6.79 metres whereas only 4.265 m is currently available. The inspection therefore will prove to be vital, as it will be determining if running AC traction would be safe.
Escalator spoilt in the rains"
.
/news/post/137925
.
Disclaimer: Please dont place your bets on this one, if conversion does get completed Well & Good... :)

Translate to English
Translate to Hindi

3 Posts

1284 views
0

Jun 22 2013 (20:31)
S_V_Iyer^~
S_V_Iyer^~   18296 blog posts
Re# 788470-4              
Good to know that atleast CR has ACfication in its paper though we don't know when it will see light of d day...... If ACfication is done by 30.06.13, then it was pave a way for faster introduction of AC Express....
Translate to English
Translate to Hindi

1241 views
0

Jun 22 2013 (20:42)
Msg_For_Train_Bookings^~
Msg_For_Train_Bookings^~   21041 blog posts
Re# 788470-5              
Still doubts hover around 30th June considering the history :P
Also i think release of 1 Full AC Rake is the big constraint (dont how will the train be prioritized in the LHB coach production)...
Translate to English
Translate to Hindi

1151 views
0

Jun 22 2013 (21:09)
Anshul~
Anshul~   8064 blog posts
Re# 788470-6              
I doubt abt CR going for Conversion now.Maybe now we have to wait for August,Sep since CR will not go for conversion during Monsoon.
Due to utter foolishness of CRS and CR,Mumbai has lost a golden opportunity of conversion in May.
Translate to English
Translate to Hindi

1155 views
0

Jun 22 2013 (21:10)guest
Re# 788470-7               Past Edits
how u blame crs ??? crs will want safety first ... who will be responsible if any death occur on acification ?????????? cr is lazy .. not inc height ..
Translate to English
Translate to Hindi

1170 views
0

Jun 22 2013 (21:31)
Msg_For_Train_Bookings^~
Msg_For_Train_Bookings^~   21041 blog posts
Re# 788470-8              
Some hopes are there since the plan is already listed, We will have to wait & watch...
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy