Saw 12638 coming in with GOC WDP-4B at TPJ on 13/7/2013 night.Does the loco change happen at TPJ?
Yes. For 12637 it happens at DG...
But not for long, soon Electric locos to enter MDU. CRS inspection was conducted today in DG-MDU-VPT stretch and was successfull. Thanks.
But not for long, soon Electric locos to enter MDU. CRS inspection was conducted today in DG-MDU-VPT stretch and was successfull. Thanks.
Today MADURAI-virdhunagar electrification trial run was held in one newspaper it was said like that........Whereas in other newspaper they say the CRS INSPECTION was postponded.......What to believe sir..............??.....:(
CRS inspection not done on 16.7.13.It has been postponed.Only trial run was conducted on 16.7.13.
Sir, when will CRS clearance be given for hauling electric locos between DG-MDU?
CRS inspection is scheduled to happen on Aug 21st. Hope at least this goes according to plan.