Search Forum
Blog Entry# 818811
Posted: Aug 01 2013 (17:14)
3 Responses
Last Response: Aug 08 2013 (23:20)
3 Responses
Last Response: Aug 08 2013 (23:20)
Aug 01 2013 (17:14) AMI/Amravati (Terminal) (4 PFs)
AmravatiSuperfast~
AmravatiSuperfast~ 598 blog postsPlease update ATLAS.
1) Badnera Bypass line is electrified.
2) Amravati-Badnera line is also electrified.
Both are Electrified Single Line Broad Gauge.
1) Badnera Bypass line is electrified.
2) Amravati-Badnera line is also electrified.
Both are Electrified Single Line Broad Gauge.