Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

प्रयागराज एक्सप्रेस - जो भी हो तुम खुदा की कसम; लाजवाब हो

Search Forum
<<prev entry    next entry>>
Blog Entry# 839931
Posted: Aug 31 2013 (11:34)

No Responses Yet
General Travel
1016 views
1

Aug 31 2013 (11:34)  
 
krishnaprasad~
krishnaprasad~   3092 blog posts
Entry# 839931              
BANGALORE-BIDAR TRAIN CONNECTIVITY
The MG Track between SBC-GTL was convered to BG in 1983 which opened the gateway for connecting blore with noth karnataka districts.A day time passenger with train no.91/92 was introduced between SBC-GTL after gauge conversion which was later extended to HOSPET converting the same as overnight train to blore from hospet and bellary.After a persistent demand the train was extended to UBL.During Sri Jaffer Sheriff period as RM a link express was introduced to BIDAR with 91/92 Hampi exp with 8 coaches to be detatched at GTL to run as 91/A/92A hampi link between gtl-bidr,whcih incidentally became 16593/94. The portion which was running upto bidar was later extended to pharbhani and to to nanded after gauge conversion.Due to persistent
...
more...
demand to bifuracate this train and run as independent train, the train was an seperate train in july 2010 by giving 16593/94 as number. The train became a slow train and it took 18 hours to reach bidar and back.There was demand to make this train an overnight train to bidar since 3 years by increasing speed. However this failed due to operational problems. Now Sri Kharge as RM a new overnight train terminating at BIDAR IS BEING RUN FROM 1ST SEPT 2013.It is a great day for HK region people.At the earliest this train should be made daily and after construction of GULBARGA-BIDAR NEW line this train 16571/72 could be run via gulbarga and humnabad to serve more area in karnataka

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy