Search Forum
Blog Entry# 860943
Posted: Sep 26 2013 (14:27)
9 Responses
Last Response: Sep 26 2013 (17:27)
9 Responses
Last Response: Sep 26 2013 (17:27)
I have been writing to SCR since 15 months to regularize these kind of trains.
Extend the Link(VSKP KZJ ) till SC and return in & around this slot and get attached to NZM KZJ VSKP @ KZJ so that it can continue as a full fledged train. The dep time can be adjusted to depart after mid night
Extend the Link(VSKP KZJ ) till SC and return in & around this slot and get attached to NZM KZJ VSKP @ KZJ so that it can continue as a full fledged train. The dep time can be adjusted to depart after mid night
4 Public Posts - Thu Sep 26, 2013
Such a long demand is not even bothered.....they why will they consider to run till HYB. The reason SCR may give is PF shortage at KZJ for forming chain to HYB
Even they a re not giving direct connectivity to PC for VSKP - NZM link,there will be only one SLRD b/w both the links.
Even they a re not giving direct connectivity to PC for VSKP - NZM link,there will be only one SLRD b/w both the links.
4 Public Posts - Thu Sep 26, 2013