Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

For RailFans, Platform Announcements are more musical than Bollywood songs. - Prince Maan

Search Forum
<<prev entry    next entry>>
Blog Entry# 883763
Posted: Oct 22 2013 (12:47)

5 Responses
Last Response: Oct 23 2013 (14:32)
Info Update
24454 views
13

★★
Oct 22 2013 (12:47)   11060/Chhapra - Mumbai LTT Express (PT) | KYN/Kalyan Junction (8 PFs)
 
Kiran P
Kiran P   722 blog posts
Entry# 883763            Tags   Past Edits
Kow Your Locomotives
WCAM 3 upgraded dual-traction models deliver 4600hp in DC mode and 5000hp in AC mode, and were jointly developed by RDSO and BHEL in 1997. Components are shared with the WCAG-1 locos (see below). Co-Co fabricated bogies (High-Adhesion -- shared with WCAG-1, WAG-7, WDG-2, etc.) with secondary suspension. Monocoque underframe. Air brakes are original equipment. They were originally manufactured under a BOLT (build-own-lease-transfer) contract with BHEL, and are probably still owned by BHEL rather than by IR.
Monocoque underframe. Axle-hung, nose-suspended, force ventilated, taper roller bearings Speed control by tap
...
more...
changers in AC mode and resistance notching in DC mode. Motors can be placed in different series-parallel combinations. Auxiliaries from Elgi, S F India, Best, Gresham & Craven, etc. Static converter from ACEC for auxiliary supply.
In DC mode, rheostatic braking by self-excitation of traction motors available
until 17km/h. Elgi compressor, other auxiliaries from S F India. Rated for 105km/h in both DC and AC mode (sometimes AC mod
e rated speed is quoted at 110km/h).
Picture by RAVI PRAJAPATI
Traction motor configurations as in the
WCAM-1/2 and WAM-4 (all 6 in series, 2S 3P, or all parallel -- the latter is the only one used under AC traction, enforced now by modifications to the locos).
CR uses WCAM-3 locos on Mumbai-Pune and Mumbai-Igatpuri sections which have ghat portions as well as speed restrictions of about 100km/h. Freight rakes double-headed by WCAM-3 (upgraded models) have been sighted on the ghat sections. For excellent WCAM-3 sightings and regular double-header WDM-2 tanker trains, the Kurla-Vidyavihar section is ideal.
MU operation possible with 3 (4?) units.
Some WCAM-3 locos now [2004] are certified only for DC operation for various reasons, although it is possible they will be fixed and returned to full dual-traction service after repairs. As of [12/05], all WCAM-3 locos had been retrofitted with roof-mounted rheostatic braking grids.
Manufacturers: BHEL
Weight: 121t
Traction Motors: Hitachi HS15250A. Axle-hung, nose-suspended, force-ventilated.
Transformer:BHEL 5400 kVA. 32 taps.
Rectifiers: Two silicon rectifier units D1800N44 (Siemens), 16 cells per bridge. 1000V / 3600A.
Gear Ratio: 64:18
Pantographs:Stone India, AM-12 (AC), AM-18 B2 (DC)
Length: 20950mm
Total wheelbase: 15698mm
Weight: 113t

Translate to English
Translate to Hindi

1 Public Posts - Tue Oct 22, 2013

2 Public Posts - Wed Oct 23, 2013

4538 views
0

Oct 23 2013 (10:33)
phillip   199 blog posts
Re# 883763-4              
sorry your information is slightly wrong . WCAM 2 is for 120 Kmph but some were upgraded to go for a max speed of 135 kmph ,which was later clasified as WCAM 2P .both the classes are with CR now. to know what i am saying check this link click here . but the prob is CR ly is using these for locos for insignificant trains like sahyadi , jayanti
etc . instead they should use the locos for all intercity trains going to pune and nashik. CR needs to know to use its resources.
Translate to English
Translate to Hindi

1 Public Posts - Wed Oct 23, 2013
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy