Search Forum
Blog Entry# 883763
Posted: Oct 22 2013 (12:47)
5 Responses
Last Response: Oct 23 2013 (14:32)
5 Responses
Last Response: Oct 23 2013 (14:32)
Oct 22 2013 (12:47) 11060/Chhapra - Mumbai LTT Express (PT) | KYN/Kalyan Junction (8 PFs)
![](http://st.indiarailinfo.com/images/1.png)
Kiran P
Kiran P 722 blog postsKow Your Locomotives
WCAM 3 upgraded dual-traction models deliver 4600hp in DC mode and 5000hp in AC mode, and were jointly developed by RDSO and BHEL in 1997. Components are shared with the WCAG-1 locos (see below). Co-Co fabricated bogies (High-Adhesion -- shared with WCAG-1, WAG-7, WDG-2, etc.) with secondary suspension. Monocoque underframe. Air brakes are original equipment. They were originally manufactured under a BOLT (build-own-lease-transfer) contract with BHEL, and are probably still owned by BHEL rather than by IR.
Monocoque underframe. Axle-hung, nose-suspended, force ventilated, taper roller bearings Speed control by tap...
more...
WCAM 3 upgraded dual-traction models deliver 4600hp in DC mode and 5000hp in AC mode, and were jointly developed by RDSO and BHEL in 1997. Components are shared with the WCAG-1 locos (see below). Co-Co fabricated bogies (High-Adhesion -- shared with WCAG-1, WAG-7, WDG-2, etc.) with secondary suspension. Monocoque underframe. Air brakes are original equipment. They were originally manufactured under a BOLT (build-own-lease-transfer) contract with BHEL, and are probably still owned by BHEL rather than by IR.
Monocoque underframe. Axle-hung, nose-suspended, force ventilated, taper roller bearings Speed control by tap...
more...
1 Public Posts - Tue Oct 22, 2013
2 Public Posts - Wed Oct 23, 2013
sorry your information is slightly wrong . WCAM 2 is for 120 Kmph but some were upgraded to go for a max speed of 135 kmph ,which was later clasified as WCAM 2P .both the classes are with CR now. to know what i am saying check this link click here . but the prob is CR ly is using these for locos for insignificant trains like sahyadi , jayanti
etc . instead they should use the locos for all intercity trains going to pune and nashik. CR needs to know to use its resources.
etc . instead they should use the locos for all intercity trains going to pune and nashik. CR needs to know to use its resources.
1 Public Posts - Wed Oct 23, 2013