Search Forum
Blog Entry# 889780
Posted: Oct 28 2013 (17:12)
8 Responses
Last Response: Nov 11 2013 (22:45)
8 Responses
Last Response: Nov 11 2013 (22:45)
Oct 28 2013 (17:12) 20104/Gorakhpur - Mumbai LTT SF Express (Via Kanpur) (PT) | HBJ/HabibGanj (5 PFs)
RaviPrajapati^~
RaviPrajapati^~ 5146 blog postsA fresh looking Bhusawal WAM-4#21330 at the helm of LHB Hybrid rake of 12541 Gorakhpur-Lokmanya Tilak Terminus SF Express went past Habibganj at a nice pace. (Mayank Kumar)
3 Posts
It cannot become 24 coacher due to length of the coach vs platform length issues.
Yes sir the coaches are long as there is 80 seats in sl but should increase ac coaches atleast 2 3ac should be made
Pushpak runs with ICF coaches. This train runs with Hybrid LHB coaches, which are longer than ICF coaches. It can get 22 coaches at most.
total train length is of 21 coaches and usually 1 extra coach attaches