Search Forum
Blog Entry# 928282
Posted: Dec 07 2013 (21:48)
3 Responses
Last Response: Dec 10 2013 (17:52)
3 Responses
Last Response: Dec 10 2013 (17:52)
Hi all..
I boarded 19568 Okha Tuticorin Vivek Express at Pune yesterday night. It arrived on time with VTA WDM3D #11416. The train was on time till Hindupur from where the trouble started. Reached Yelahanka at 17:10 hrs. late by 1 hr due to many crossings. I seriously feel that IR should have doubled this line first instead of electrification. One more shocking thing, the train was routed via Gooty today. Has the route been changed or does this train run based on route availability in this section Guntakal/GTL - Kalluru/KLU .. ?
Videos...
more...
I boarded 19568 Okha Tuticorin Vivek Express at Pune yesterday night. It arrived on time with VTA WDM3D #11416. The train was on time till Hindupur from where the trouble started. Reached Yelahanka at 17:10 hrs. late by 1 hr due to many crossings. I seriously feel that IR should have doubled this line first instead of electrification. One more shocking thing, the train was routed via Gooty today. Has the route been changed or does this train run based on route availability in this section Guntakal/GTL - Kalluru/KLU .. ?
Videos...
more...
as per the timetable this goes via GTL-KLU(chkd in Intermediate stns), but how can they give signal via GY...that too there is no intimation... the distance bet gtl-atp is 68kms as per the timetable
Yeah doubling was badly needed and don't know why they tookup electrification first?