Search Forum
Blog Entry# 948041
Posted: Dec 27 2013 (22:19)
7 Responses
Last Response: Dec 27 2013 (22:45)
7 Responses
Last Response: Dec 27 2013 (22:45)
AC-DC conversion 1500V-DC to 25KV-AC Electrification completed in mumbai central railway suburban section.
no need to say anything. the words painted on the wag-7 convey the message clearly to all. the test charge on the KYN-LTT section was carried out successfully on 30-12-2012.
click here
no need to say anything. the words painted on the wag-7 convey the message clearly to all. the test charge on the KYN-LTT section was carried out successfully on 30-12-2012.
click here
3 Public Posts - Fri Dec 27, 2013
Are conversion nahi huva he ab tak. Abhi tak 2 test charge kiye he CR ne. Eak KYN-LTT(fast) par Dec 2012 me aur July 2013 me KYN-LTT(slow) line par.
3 Public Posts - Fri Dec 27, 2013