Search Forum
Blog Entry# 953501
Posted: Jan 03 2014 (00:50)
11 Responses
Last Response: Jan 03 2014 (16:45)
11 Responses
Last Response: Jan 03 2014 (16:45)
Pic 1. Newly constructed auto parking and station gate.
Pic 2. Work of tunnel for 5th and 6th line is in full flow near Mumbra station
Pic 2. Work of tunnel for 5th and 6th line is in full flow near Mumbra station
5 Public Posts - Fri Jan 03, 2014
Yes... Mumbra local will be a welcome move....so no need of Kalwa halt for fast trains then...
I think even the old Mumbra flyover will be dismantled for new railway lines and a new exit will branch out of new flyer and join the Mumbra station road...
Pls...
more...
I think even the old Mumbra flyover will be dismantled for new railway lines and a new exit will branch out of new flyer and join the Mumbra station road...
Pls...
more...
5 Public Posts - Fri Jan 03, 2014